Quick answers
What is Heerapur Crusher Stone mine for making Gitti & M-sand?
Heerapur Crusher Stone mine for making Gitti & M-sand is an approved mining project in Gothra, Sheopur, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Ashok Kumar Saraf.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Aug 2026), as of 27 Nov 2026.
Where is it?
In Gothra, Sheopur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 29 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Aug 2026 |
| Application filed | 29 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ashok Kumar Saraf |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Gothra |
| Taluk / tehsil | Sheopur |
| District | Sheopur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05987 |
In context
71 applications in Sheopur since January 2022 are in the same category (Mining): 47 approved, 8 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is smaller than 56% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Gothra, Sheopur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sheopur- Chambal Multi Village Water Supply Scheme, Sheopur — more information requested, 9.6 km away
- Daula Ka Pura Stone mine for making Gitti, Boulder & M-sand — environmental approval granted, 9.7 km away
- Bow Shaped Ghat ( River Front Step ) At Rameshwar Triveni Sangam Gram Fatehpur… — under wildlife review, 10.6 km away
- Bow Shaped Ghat ( River Front Step ) At Rameshwari Triveni Sangam Fatehpur… — application filed, 10.7 km away
- Soikalan Soil Quarry (For Bricks Manufacturing ) — under environmental review, 14.6 km away
- Soikalan Soil Quarry (For Making Bricks) — lapsed, 14.7 km away
- Soikalan Soil Quarry (For Making Bricks) — lapsed, 14.7 km away
- Soikalan Soil Quarry — environmental approval granted, 14.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.