Quick answers
What is this project?
Warjiri Dadar and Bear Hill Bauxite Block (M. L. Area – 117.15 ha) By M/s Nisarg Ispat Private Ltd is a proposed mining project in Protected Forest, Paraswada, Balaghat, Madhya Pradesh. The site covers 289.5 acres.
Who is building it?
The applicant is Nisarg Ispat PVT. LTD.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 3 Jun 2025), as of 27 Nov 2026.
Where is it?
In Protected Forest, Paraswada, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹25.5 crore and a site of 289.5 acres.
When was it filed?
The application was filed on 24 May 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 Jun 2025 |
| Application filed | 24 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Nisarg Ispat PVT. LTD |
| Land area | 289.5 acres (117.2 ha) |
| Project cost | ₹25.5 crore |
| Village / locality | Protected Forest |
| Taluk / tehsil | Paraswada |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06122 |
In context
204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 289.5 acres, this one is larger than 93% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 1,143.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Protected Forest, Paraswada, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining lease for Warjiri Dadar and Bear Hill Bauxite Block — under forest review, 50 m away
- laugher underground MANGANESE ORE MINE (10.00 ha) — environmental approval granted, 2.6 km away
- Mining Lease for Kotpahar Bauxite Block — under forest review, 2.7 km away
- Kotpahar Bauxite Block (M. L. Area 35.90 ha) Located in Forest Compartment no.… — cleared for impact study, 2.7 km away
- Transfer of Environmental Clearance - "EC issued vide letter No. 1082/SEIAA/18… — environmental approval granted, 5 km away
- Obtaining Environment Clearance for Rom Capacity of 443762.60onne Per Annum… — under environmental review, 5.8 km away
- Forest diversion of Dadartola Dadar Bauxite block — under forest review, 6.8 km away
- Dadartola Dadar Bauxite Block — lapsed, 6.8 km away
More from Nisarg Ispat PVT. LTD in Balaghat
- Mining lease for Warjiri Dadar and Bear Hill Bauxite Block — under forest review
All 5 Nisarg Ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.