Under environmental reviewMining · Balaghat, Madhya Pradesh

Obtaining Environment Clearance for Rom Capacity of 443762.60onne Per Annum (Bauxite – 154993.8 Tpa, Lateritic Soil/Ob – 169542.80 and Mine Waste As Low Grade Saleable Mineral – 119226tpa) With Beneficiation of Bauxite by Calcinations Process With Throughout Input Capacity of 154993.8tpa for Pachama Dadar Bauxite Auction Block Mine (156.00ha), Which Is

Obtaining Environment Clearance for Rom Capacity of 443762.60onne Per Annum (Bauxite – 154993.8 Tpa, Lateritic Soil/Ob – 169542.80 and Mine Waste As Low Grade Saleable Mineral – 119226tpa) With Beneficiation of Bauxite by Calcinations Process With Throughout Input Capacity of 154993.8tpa for Pachama Dadar Bauxite Auction Block Mine (156.00ha), Which Is is a proposed mining project in Protected Forest, Paraswada, Balaghat, Madhya Pradesh. The site covers 385.5 acres. Its stated project cost is ₹53.5 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 29 Aug 2026).

See it on the live map All projects in Balaghat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Obtaining Environment Clearance for Rom Capacity of 443762.60onne Per Annum (Bauxite – 154993.8 Tpa, Lateritic Soil/Ob – 169542.80 and Mine Waste As Low Grade Saleable Mineral – 119226tpa) With Beneficiation of Bauxite by Calcinations Process With Throughout Input Capacity of 154993.8tpa for Pachama Dadar Bauxite Auction Block Mine (156.00ha), Which Is is a proposed mining project in Protected Forest, Paraswada, Balaghat, Madhya Pradesh. The site covers 385.5 acres.

Who is building it?

The applicant is Sagar Stone Industries.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Protected Forest, Paraswada, Balaghat, Madhya Pradesh.

How big is it?

It has a stated cost of ₹53.5 crore and a site of 385.5 acres.

When was it filed?

The application was filed on 12 Aug 2026.

Project details

Official titleObtaining Environment Clearance for Rom Capacity of 443762.60onne Per Annum (Bauxite – 154993.8 Tpa, Lateritic Soil/Ob – 169542.80 and Mine Waste As Low Grade Saleable Mineral – 119226tpa) With Beneficiation of Bauxite by Calcinations Process With Throughout Input Capacity of 154993.8tpa for Pachama Dadar Bauxite Auction Block Mine (156.00ha), Which Is Situated at Village- Pachama Dadar, Tehsil - Baihar & Dist. – Balaghat, Madhya Pradesh by M/S Sagar Stone Industries
StatusUnder environmental review
Status since29 Aug 2026
Application filed12 Aug 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSagar Stone Industries
Land area385.5 acres (156 ha)
Project cost₹53.5 crore
Village / localityProtected Forest
Taluk / tehsilParaswada
DistrictBalaghat
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-08665

In context

204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 385.5 acres, this one is larger than 95% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Protected Forest, Paraswada, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.