Quick answers
What is this project?
Bargi Pumped Storage Hydro Project (1000 MW) by M/s. Serentica Renewables India 21 Pvt. Ltd is a proposed water and irrigation project in Pindrai Mal. (Sahajpuri), Narayanganj, Mandla, Madhya Pradesh. The site covers 6,766.5 acres.
Who is building it?
The applicant is Serentica Renewables India 21 Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Nov 2025), as of 27 Nov 2026.
Where is it?
In Pindrai Mal. (Sahajpuri), Narayanganj, Mandla, Madhya Pradesh.
How big is it?
It has a stated cost of ₹4,689.9 crore and a site of 6,766.5 acres.
When was it filed?
The application was filed on 29 Sept 2025.
Project details
| Official title | Bargi Pumped Storage Hydro Project (1000 MW) at District: Mandla, Madhya Pradesh by M/s. Serentica Renewables India 21 Pvt. Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 24 Nov 2025 |
| Application filed | 29 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Serentica Renewables India 21 Private Limited |
| Land area | 6,766.5 acres (2,738.3 ha) |
| Project cost | ₹4,689.9 crore |
| Village / locality | Pindrai Mal. (Sahajpuri) |
| Taluk / tehsil | Narayanganj |
| District | Mandla |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06243 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Nov 2026 | Initial checks | 6,766.5 acres | ₹4,689.9 crore |
| Early planning filed 29 Sept 2025 (this page) | Cleared for impact study | 6,766.5 acres | ₹4,689.9 crore |
In context
26 applications in Mandla since January 2022 are in the same category (Water & irrigation): 21 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 6,766.5 acres, this one is larger than 92% of them.
Where it is
Pindrai Mal. (Sahajpuri), Narayanganj, Mandla, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bargi Pumped Storage Hydro Project (1000 MW) by M/s. Serentica Renewables… — initial checks, 0 m away
- Narayanganj-Bijadandi Multi Village Rural Water Supply Scheme (Barela Range) — forest land use approved, 9.7 km away
- घोंटखेडा से जमुनिया तक ग्रेवल सडक एवं पुलिया निर्माण by Kanhaiya Dhurwey — lapsed, 13.6 km away
- Narayanganj-Bijadandi Multi Village Rural Water Supply Scheme — forest land use approved, 13.6 km away
- Narayanganj Bijadandi Mvs — lapsed, 14.7 km away
- Narayanganj Bijadandi Mvs — lapsed, 15.2 km away
- Narayanganj Bijadandi Rural Water Supply Scheme — forest land use approved, 16 km away
- Chargawamal Basalt Stone Quarry Lease Mine — under environmental review, 16.1 km away