Quick answers
What is this project?
Bargi Pumped Storage Hydro Project (1000 MW) by M/s. Serentica Renewables India 21 Pvt. Ltd is a proposed power project in Pindrai Mal. (Sahajpuri), Narayanganj, Mandla, Madhya Pradesh. The site covers 6,766.5 acres.
Who is building it?
The applicant is Serentica Renewables India 21 Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Pindrai Mal. (Sahajpuri), Narayanganj, Mandla, Madhya Pradesh.
How big is it?
It has a stated cost of ₹4,689.9 crore; a site of 6,766.5 acres and 669.7 acres (271 ha) of forest land.
When was it filed?
The application was filed on 6 Nov 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Bargi Pumped Storage Hydro Project (1000 MW) by M/s. Serentica Renewables India 21 Pvt.…
Project details
| Official title | Bargi Pumped Storage Hydro Project (1000 MW) at District: Mandla, Madhya Pradesh by M/s. Serentica Renewables India 21 Pvt. Ltd. |
|---|---|
| Status | Initial checks |
| Status since | 6 Nov 2026 |
| Application filed | 6 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Serentica Renewables India 21 Private Limited |
| Land area | 6,766.5 acres (2,738.3 ha) |
| Forest land | 669.7 acres (271 ha) |
| Project cost | ₹4,689.9 crore |
| Village / locality | Pindrai Mal. (Sahajpuri) |
| Taluk / tehsil | Narayanganj |
| District | Mandla |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-12253 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Nov 2026 (this page) | Initial checks | 6,766.5 acres | ₹4,689.9 crore |
| Early planning filed 29 Sept 2025 | Cleared for impact study | 6,766.5 acres | ₹4,689.9 crore |
In context
7 applications in Mandla since January 2022 are in the same category (Power): 2 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
Where it is
Pindrai Mal. (Sahajpuri), Narayanganj, Mandla, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bargi Pumped Storage Hydro Project (1000 MW) by M/s. Serentica Renewables… — cleared for impact study, 0 m away
- Narayanganj-Bijadandi Multi Village Rural Water Supply Scheme (Barela Range) — forest land use approved, 9.7 km away
- घोंटखेडा से जमुनिया तक ग्रेवल सडक एवं पुलिया निर्माण by Kanhaiya Dhurwey — lapsed, 13.6 km away
- Narayanganj-Bijadandi Multi Village Rural Water Supply Scheme — forest land use approved, 13.6 km away
- Narayanganj Bijadandi Mvs — lapsed, 14.7 km away
- Narayanganj Bijadandi Mvs — lapsed, 15.2 km away
- Narayanganj Bijadandi Rural Water Supply Scheme — forest land use approved, 16 km away
- Chargawamal Basalt Stone Quarry Lease Mine — under environmental review, 16.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.