Quick answers
What is this project?
PARWALIYA SADAK STONE QUARRY (Khasra No. 501, Area- 2.023 HA) is a proposed mining project in Parwaliya Road, Huzur, Bhopal, Madhya Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Ramchandra Premchandani.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Apr 2025), as of 27 Nov 2026.
Where is it?
In Parwaliya Road, Huzur, Bhopal, Madhya Pradesh.
How big is it?
It has a stated cost of ₹80 lakh and a site of 5 acres.
When was it filed?
The application was filed on 8 Apr 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 11 Apr 2025 |
| Application filed | 8 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ramchandra Premchandani |
| Land area | 5 acres (2 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Parwaliya Road |
| Taluk / tehsil | Huzur |
| District | Bhopal |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06510 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 8 Apr 2025 (this page) | Cleared for impact study | 5 acres | ₹80 lakh |
| New project filed 30 Nov 2024 | Lapsed | 5 acres | ₹80 lakh |
In context
173 applications in Bhopal since January 2022 are in the same category (Mining): 87 approved, 30 filed or under review, and 56 withdrawn, lapsed or rejected. The approved ones took a median of 21 days from filing to approval. At 5 acres, this one is smaller than 72% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 17.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Parwaliya Road, Huzur, Bhopal, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PARWALIYA SADAK STONE QUARRY (Khasra No. 501, Area- 2.023 HA) — lapsed, 0 m away
- PARWALIYA SADAK STONE QUARRY (Khasra No.-508, Area- 2.00 HA) — lapsed, 100 m away
- Shahpur Stone Quarry — cleared for impact study, 400 m away
- Shahpur Stone Quarry — lapsed, 400 m away
- Parwaliya Sadak Stone Quarry of Devendra Trigunayak — not approved, 450 m away
- Parwaliya Sadak Stone Quarry of Devendra Trigunayak — lapsed, 450 m away
- Parwaliya Sadak Stone Quarry of Devendra Trigunayak — lapsed, 450 m away
- Shahpur (Parwaliya Sadak) Stone, M-Sand & Murrum Quarry — lapsed, 650 m away
More from Ramchandra Premchandani in Bhopal
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.