Quick answers
What is Parwaliya Sadak Stone Quarry of Devendra Trigunayak?
Parwaliya Sadak Stone Quarry of Devendra Trigunayak is a rejected mining project in Parwaliya Road, Huzur, Bhopal, Madhya Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Devendra Trigunayak.
Has it been approved?
No. The application was rejected on 16 Sept 2025.
Where is it?
In Parwaliya Road, Huzur, Bhopal, Madhya Pradesh.
How big is it?
It has a stated cost of ₹30 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 1 May 2025.
Project details
| Status | Not approved |
|---|---|
| Status since | 16 Sept 2025 |
| Application filed | 1 May 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Devendra Trigunayak |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Parwaliya Road |
| Taluk / tehsil | Huzur |
| District | Bhopal |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07523 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 1 May 2025 (this page) | Not approved | 2.5 acres | ₹30 lakh |
| Validity extension filed 16 Apr 2025 | Lapsed | 7.4 acres | ₹40 lakh |
| New project filed 20 Mar 2024 | Lapsed | 2.5 acres | ₹30 lakh |
In context
173 applications in Bhopal since January 2022 are in the same category (Mining): 87 approved, 30 filed or under review, and 56 withdrawn, lapsed or rejected. The approved ones took a median of 21 days from filing to approval. At 2.5 acres, this one is smaller than 99% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 18.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Parwaliya Road, Huzur, Bhopal, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Parwaliya Sadak Stone Quarry of Devendra Trigunayak — lapsed, 0 m away
- Parwaliya Sadak Stone Quarry of Devendra Trigunayak — lapsed, 50 m away
- Shahpur (Parwaliya Sadak) Stone, M-Sand & Murrum Quarry — lapsed, 300 m away
- PARWALIYA SADAK STONE QUARRY (Khasra No.-508, Area- 2.00 HA) — lapsed, 350 m away
- PARWALIYA SADAK STONE QUARRY (Khasra No. 501, Area- 2.023 HA) — cleared for impact study, 450 m away
- PARWALIYA SADAK STONE QUARRY (Khasra No. 501, Area- 2.023 HA) — lapsed, 450 m away
- Barkheda Bondar stone Mine — under environmental review, 550 m away
- Barkheda Bondar stone Mine — cleared for impact study, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.