Quick answers
What is LAR KHURD PARAI NADI – RIVER SAND QUARRY (Survey No. – 01)?
LAR KHURD PARAI NADI – RIVER SAND QUARRY (Survey No. – 01) is a lapsed mining project in Larkhurd, Jatara, Tikamgarh, Madhya Pradesh. The site covers 4.4 acres.
Who is building it?
The applicant is Nagendra Singh.
Has it been approved?
No. The application was lapsed on 11 Dec 2025, so it is no longer under consideration.
Where is it?
In Larkhurd, Jatara, Tikamgarh, Madhya Pradesh.
How big is it?
It has a stated cost of ₹34 lakh and a site of 4.4 acres.
When was it filed?
The application was filed on 20 Jan 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: LAR KHURD PARAI NADI – RIVER SAND QUARRY (Survey No. – 01)
Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Dec 2025 |
| Application filed | 20 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nagendra Singh |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹34 lakh |
| Village / locality | Larkhurd |
| Taluk / tehsil | Jatara |
| District | Tikamgarh |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06714 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jan 2025 (this page) | Lapsed | 4.4 acres | ₹34 lakh |
| Early planning filed 29 Jan 2024 | Cleared for impact study | 4.4 acres | ₹34 lakh |
In context
116 applications in Tikamgarh since January 2022 are in the same category (Mining): 61 approved, 18 filed or under review, and 37 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.4 acres, this one is smaller than 89% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Larkhurd, Jatara, Tikamgarh, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- LAR KHURD PARAI NADI – RIVER SAND QUARRY (Survey No. – 01) — cleared for impact study, 0 m away
- Lar Khurd Parai Nadi – River Sand Quarry — cleared for impact study, 900 m away
- Hiradya Nagar – River Sand Quarry — lapsed, 2.3 km away
- Hiradya Nagar – River Sand Quarry — cleared for impact study, 2.3 km away
- Pathara Stone(gitti) and M-Sand Quarry — environmental approval granted, 3.1 km away
- Pathara Crusher Stone Quarry — lapsed, 3.1 km away
- Machigarh Pyrophyllite and Diaspore deposit, Lease Area 19.00 Ha (Mining Area… — environmental approval granted, 4.7 km away
- Machigarh Pyrophyllite and Diaspore deposit, Lease Area 19.00 Ha (Mining Area… — cleared for impact study, 4.7 km away
More from Nagendra Singh in Tikamgarh
- Touriya Ugad – River Sand Quarry — lapsed
- Saipura – River Sand Quarry — environmental approval granted
- Pachora – River Sand Quarry — not approved
- Pachghara River Sand Quarry — not approved
- Kubri – River Sand Quarry — environmental approval granted
- Karola – River Sand Quarry — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.