Quick answers
What is Pachghara River Sand Quarry?
Pachghara River Sand Quarry is a rejected mining project in Pachora, Palera, Tikamgarh, Madhya Pradesh. The site covers 13.1 acres.
Who is building it?
The applicant is Nagendra Singh.
Has it been approved?
No. The application was rejected on 9 Jan 2026.
Where is it?
In Pachora, Palera, Tikamgarh, Madhya Pradesh.
How big is it?
It has a stated cost of ₹19 lakh and a site of 13.1 acres.
When was it filed?
The application was filed on 20 Jan 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Pachghara River Sand Quarry
Project details
| Status | Not approved |
|---|---|
| Status since | 9 Jan 2026 |
| Application filed | 20 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nagendra Singh |
| Land area | 13.1 acres (5.3 ha) |
| Project cost | ₹19 lakh |
| Village / locality | Pachora |
| Taluk / tehsil | Palera |
| District | Tikamgarh |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07545 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jan 2025 (this page) | Not approved | 13.1 acres | ₹19 lakh |
| Early planning filed 29 Jan 2024 | Cleared for impact study | 13.1 acres | ₹19 lakh |
In context
116 applications in Tikamgarh since January 2022 are in the same category (Mining): 61 approved, 18 filed or under review, and 37 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 13.1 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Pachora, Palera, Tikamgarh, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pachghara River Sand Quarry — cleared for impact study, 0 m away
- Pachora – River Sand Quarry — not approved, 1.5 km away
- Pachora – River Sand Quarry — cleared for impact study, 1.5 km away
- Uparara Chakra-2 Sand Quarry — environmental approval granted, 6.6 km away
- Construction Of 400KV D/C Quad Moose Garautha - Talbehat T/Line — lapsed, 6.8 km away
- Veerpura Sand Quarry — environmental approval granted, 8.1 km away
- Mahewa Chak-4 Sand Quarry — environmental approval granted, 8.2 km away
- Madhori Sand Quarry — environmental approval granted, 9.1 km away
More from Nagendra Singh in Tikamgarh
- LAR KHURD PARAI NADI – RIVER SAND QUARRY (Survey No. – 01) — lapsed
- Touriya Ugad – River Sand Quarry — lapsed
- Saipura – River Sand Quarry — environmental approval granted
- Pachora – River Sand Quarry — not approved
- Kubri – River Sand Quarry — environmental approval granted
- Karola – River Sand Quarry — environmental approval granted