Project details
| Status | Not approved |
|---|---|
| Status since | 12 May 2026 |
| Application filed | 30 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ganesh Singh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Bari |
| Taluk / tehsil | Gopadbanas |
| District | Sidhi |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06867 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Oct 2025 (this page) | Not approved | 2.5 acres | ₹45 lakh |
| New project filed 10 Dec 2023 | Lapsed | 2.5 acres | ₹45 lakh |
In context
105 applications in Sidhi since January 2022 are in the same category (Mining): 43 approved, 12 filed or under review, and 50 withdrawn, lapsed or rejected. The approved ones took a median of 18 days from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bari, Gopadbanas, Sidhi, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bari Stone Quarry Lease — lapsed, 0 m away
- L118-Sidhi-Beohari Road to Baiga Basti Chauphal Pawai — more information requested, 5.6 km away
- Chuli-Barora Limestone Block — forest land use approved, 5.7 km away
- Widening of Existing 2 lane to 4 lane Divided Carriageway with Paved Shoulder… — forest land use approved, 6.4 km away
- Widening of Existing 2 lane to 4 lane Divided Carriageway with Paved Shoulder… — decision issued, 6.4 km away
- Widening of Existing 2 lane to 4 lane Divided Carriageway with Paved Shoulder… — decision issued, 6.4 km away
- Widening of Existing 2 lane to 4 lane Divided Carriageway with Paved Shoulder… — lapsed, 6.4 km away
- Preliminary exploration for Base metal, Graphite and associated mineralization… — forest land use approved, 6.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.