One of 2 filings for this project. The project's main page, with every filing and where each stands: Widening of Existing 2 lane to 4 lane Divided Carriageway with Paved Shoulder from KM…
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Mar 2026 |
| Application filed | 8 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highways Authority of India (NHAI) |
| Land area | 322.4 acres (130.5 ha) |
| Forest land | 28.1 acres (11.4 ha) |
| Project cost | ₹389.4 crore |
| Village / locality | Jogipur South Tola |
| Taluk / tehsil | Gopadbanas |
| District | Sidhi |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10291 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Jan 2025 | Decision issued | 322.4 acres | ₹389.4 crore |
| New project filed 8 Dec 2024 (this page) | Lapsed | 322.4 acres | ₹389.4 crore |
In context
33 applications in Sidhi since January 2022 are in the same category (Roads & highways): 4 approved, 19 filed or under review, and 8 withdrawn, lapsed or rejected. At 322.4 acres, this one is larger than 91% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jogipur South Tola, Gopadbanas, Sidhi, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening of Existing 2 lane to 4 lane Divided Carriageway with Paved Shoulder… — decision issued, 0 m away
- Widening of Existing 2 lane to 4 lane Divided Carriageway with Paved Shoulder… — forest land use approved, 0 m away
- Widening of Existing 2 lane to 4 lane Divided Carriageway with Paved Shoulder… — decision issued, 0 m away
- Sidhi Bansagar Mvs — decision issued, 2.8 km away
- KARGIL STONE MINE (Area -2.0ha) — lapsed, 3.2 km away
- Kargil Stone Mine — lapsed, 3.2 km away
- Chuli-Barora Limestone Block — forest land use approved, 5.2 km away
- Bari Stone Quarry Lease — not approved, 6.4 km away
4 National Highways Authority of India (NHAI) projects in Sidhi
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.