Quick answers
What is this project?
Proposed Coal Washery Plant of 2.5 MTPA Capacity of Alpha Coal Benefication and Infrastructure LLP at Pidartali Industrial Area, District - Singrauli, Madhya Pradesh is a proposed mining project in Waidhan, Singrauli, Madhya Pradesh. The site covers 185.6 acres.
Who is building it?
The applicant is Alpha Coal Benefication and Infrastructure LLP.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Waidhan, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹70 crore and a site of 185.6 acres.
When was it filed?
The application was filed on 6 Sept 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Coal Washery Plant of 2.5 MTPA Capacity of Alpha Coal Benefication and…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 9 Oct 2025 |
| Application filed | 6 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Alpha Coal Benefication and Infrastructure LLP |
| Land area | 185.6 acres (75.1 ha) |
| Project cost | ₹70 crore |
| Village / locality | Waidhan |
| Taluk / tehsil | Singrauli |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07057 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 30 Oct 2025 | Cleared for impact study | 111.5 acres | ₹70 crore |
| Early planning filed 6 Sept 2025 (this page) | Returned to applicant | 185.6 acres | ₹70 crore |
| Early planning filed 4 Jul 2025 | Returned to applicant | 56.4 acres | ₹70 crore |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 185.6 acres, this one is larger than 77% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Waidhan, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Eastern Extension of Sonkurwa Gold Block, Singrauli, Madhya Pradesh — forest land use approved, 4.3 km away
- Eastern Extension of Sonkurwa Gold Block — forest land use approved, 4.3 km away
- Proposed Coal Washery Plant of 2.5 MTPA Capacity of Alpha Coal Benefication… — returned to applicant, 4.9 km away
- sirgudi Stone Quarry — lapsed, 5.3 km away
- Diversion of Existing Road Passing through Gurhar Pahar Gold Block and Mineral… — lapsed, 5.3 km away
- Byodihar Gold and Basemetal(Lead & Silver) Block — forest land use approved, 5.7 km away
- Setting up a Mineral Processing and Metal Recovery unit of 3000 TPD (Phase 1:… — withdrawn, 6.6 km away
- Setting up a Gold Concentrate unit 3000 TPD (Phase 1: 500 TPD, Phase 2: 1000… — withdrawn, 6.6 km away
All 3 Alpha Coal Benefication projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.