| Status | Lapsed |
|---|---|
| Status since | 21 Dec 2025 |
| Application filed | 20 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ram Prakash Dixit |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Rana |
| Taluk / tehsil | Lakhnadon |
| District | Seoni |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07238 |
In context
83 applications in Seoni since January 2022 are in the same category (Mining): 44 approved, 8 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 2.5 acres, this one is smaller than 99% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Rana, Lakhnadon, Seoni, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Joba Crusher Stone Quarry Lease — environmental approval granted, 7 km away
- 33KV Lakhnadon to Ganeshganj Interconnection — forest land use approved, 13.6 km away
- 33KV Lakhnadon to Ganeshganj Interconnection — lapsed, 13.6 km away
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved, 14.3 km away
- New 33KV Adegaon Line Inter. With Jhabua 33KV Line — forest land use approved, 16.3 km away
- New 33KV Adegaon Line Inter. With Jhabua 33KV Line — lapsed, 16.3 km away
- Sher Irrigation Complex Dam-1 — environmental approval granted, 16.5 km away
- Construction of Balpur to Dhanora road — forest land use approved, 17.1 km away