Project details
| Status | Forest land use approved |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 25 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Rajesh Dhurve |
| Land area | 263.6 acres (106.7 ha) |
| Forest land | 1.8 acres (0.7 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Patlon |
| Taluk / tehsil | Lakhnadon |
| District | Seoni |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10062 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Aug 2025 (this page) | Forest land use approved | 263.6 acres | ₹95 lakh |
| Change of use filed 16 Aug 2024 | Lapsed | 263.6 acres | ₹95 lakh |
In context
15 applications in Seoni since January 2022 are in the same category (Power): 6 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 263.6 acres, this one is smaller than 73% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Patlon, Lakhnadon, Seoni, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New 33KV Adegaon Line Inter. With Jhabua 33KV Line — lapsed, 0 m away
- Kasai Stone Quarry — environmental approval granted, 1.8 km away
- Sher Irrigation Complex Project Dam-1 — forest land use approved, 1.9 km away
- Construction, Operation and Maintenance of Sher Irrigation Complex Project… — lapsed, 1.9 km away
- Kasai Stone Quarry — lapsed, 2.1 km away
- Sher Irrigation Complex Dam-1 — environmental approval granted, 2.4 km away
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved, 6.2 km away
- Sher Irrigation Complex Project Dam-2 — lapsed, 7.5 km away
More from Rajesh Dhurve in Seoni
- New 33 KV Line Dargada to Nayanagar — forest land use approved
- 33KV Lakhnadon to Ganeshganj Interconnection — forest land use approved
- 33KV Chamari to Ghunai — forest land use approved
- 33 KV Ramgarh Keolari to Amarwada — forest land use approved
- 33KV Line Kedarpur S/S to Selwada S/S — forest land use approved
- New 33 KV Line Dargada to Nayanagar — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.