Greenfield Grain Based Ethanol Plant of Total Capacity of 400 KLD (200 KLD in Phase-1 +200 KLD in Phase-2) by M/s Hindustan Green Energy Limited is a lapsed industrial project in Gurughat, Khairlanji, Balaghat, Madhya Pradesh. The site covers 34.6 acres.
Who is building it?
The applicant is Hindustan Green Energy Limited.
Has it been approved?
No. The application was lapsed on 7 Oct 2025, so it is no longer under consideration.
Where is it?
In Gurughat, Khairlanji, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹450.2 crore and a site of 34.6 acres.
When was it filed?
The application was filed on 22 Aug 2025.
Project details
| Official title | Greenfield Grain Based Ethanol Plant of Total Capacity of 400 KLD (200 KLD in Phase-1 +200 KLD in Phase-2) along with 14 MW (7 MW in Phase-1 + 7 MW in Phase-2) Co-generation power plant located at Village- Gudrughat, Tehsil- Khairlanji, District- Balaghat, Madhya Pradesh by M/s Hindustan Green Energy Limited |
|---|---|
| Status | Lapsed |
| Status since | 7 Oct 2025 |
| Application filed | 22 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Hindustan Green Energy Limited |
| Land area | 34.6 acres (14 ha) |
| Project cost | ₹450.2 crore |
| Village / locality | Gurughat |
| Taluk / tehsil | Khairlanji |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07489 |
In context
10 applications in Balaghat since January 2022 are in the same category (Industry): 4 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. At 34.6 acres, this one is larger than 60% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gurughat, Khairlanji, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Manganese Mining, Miragpur Village, Tehsil Waraseoni Balaghat District of… — under environmental review, 1.1 km away
- Transfer of Prior EC granted in favour of Shri Kailash Jain Chouradiya,… — under environmental review, 1.2 km away
- Obtaining Environmental Clearance for proposed capacity expansion from 60000… — lapsed, 1.3 km away
- Hatoda Manganese Ore Mine — under environmental review, 3.5 km away
- Hatoda Manganese Ore Mine — under environmental review, 3.5 km away
- MOHAGAONGHAT MANGANESE ORE MINE (28.02 Ha) BALAGHAT (M.P.) — forest land use approved, 5 km away
- Mohagaonghat Manganese Ore Mine, Balaghat (M.P.) — more information requested, 5 km away
- Mohagaonghat Manganese Ore Mine — cleared for impact study, 5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.