Quick answers
What is this project?
Obtaining Environmental Clearance for proposed capacity expansion from 60000 TPA of Manganese ore to total ROM of 79871.20 TPA (Manganese Ore = 75357.8 TPA, waste-547.20TPA and Reject = 3966.2 TPA) by M/s D. P. Rai is a lapsed mining project in Pandharwani, Khairlanji, Balaghat, Madhya Pradesh. The site covers 36.8 acres.
Who is building it?
The applicant is D P Rai.
Has it been approved?
No. The application was lapsed on 7 Nov 2026, so it is no longer under consideration.
Where is it?
In Pandharwani, Khairlanji, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2 crore and a site of 36.8 acres.
When was it filed?
The application was filed on 3 Sept 2026.
Project details
| Official title | obtaining Environmental Clearance for proposed capacity expansion from 60000 TPA of Manganese ore to total ROM of 79871.20 TPA (Manganese Ore = 75357.8 TPA, waste-547.20TPA and Reject = 3966.2 TPA) at Village: Pandharwani, Tehsil- Khairlanji & Dist. Balaghat (MP) by M/s D. P. Rai |
|---|---|
| Status | Lapsed |
| Status since | 7 Nov 2026 |
| Application filed | 3 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | D P Rai |
| Land area | 36.8 acres (14.9 ha) |
| Project cost | ₹2 crore |
| Village / locality | Pandharwani |
| Taluk / tehsil | Khairlanji |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08264 |
In context
204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 36.8 acres, this one is larger than 81% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 42.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Pandharwani, Khairlanji, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Manganese Mining, Miragpur Village, Tehsil Waraseoni Balaghat District of… — under environmental review, 250 m away
- Transfer of Prior EC granted in favour of Shri Kailash Jain Chouradiya,… — under environmental review, 550 m away
- Greenfield Grain Based Ethanol Plant of Total Capacity of 400 KLD (200 KLD in… — lapsed, 1.3 km away
- Hatoda Manganese Ore Mine — under environmental review, 3.4 km away
- Hatoda Manganese Ore Mine — under environmental review, 3.4 km away
- MOHAGAONGHAT MANGANESE ORE MINE (28.02 Ha) BALAGHAT (M.P.) — forest land use approved, 3.7 km away
- Mohagaonghat Manganese Ore Mine, Balaghat (M.P.) — more information requested, 3.7 km away
- Mohagaonghat Manganese Ore Mine — cleared for impact study, 3.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.