What is Developing? Open the mapMap

LapsedMining · Balaghat, Madhya Pradesh

Obtaining Environmental Clearance for proposed capacity expansion from 60000 TPA of Manganese ore to total ROM of 79871.20 TPA (Manganese Ore = 75357.8 TPA, waste-547.20TPA and Reject = 3966.2 TPA) by M/s D. P. Rai

Obtaining Environmental Clearance for proposed capacity expansion from 60000 TPA of Manganese ore to total ROM of 79871.20 TPA (Manganese Ore = 75357.8 TPA, waste-547.20TPA and Reject = 3966.2 TPA) by M/s D. P. Rai is a lapsed mining project in Pandharwani, Khairlanji, Balaghat, Madhya Pradesh. The site covers 36.8 acres. Its stated project cost is ₹2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 7 Nov 2026).

See it on the live map All projects in Balaghat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Obtaining Environmental Clearance for proposed capacity expansion from 60000 TPA of Manganese ore to total ROM of 79871.20 TPA (Manganese Ore = 75357.8 TPA, waste-547.20TPA and Reject = 3966.2 TPA) by M/s D. P. Rai is a lapsed mining project in Pandharwani, Khairlanji, Balaghat, Madhya Pradesh. The site covers 36.8 acres.

Who is building it?

The applicant is D P Rai.

Has it been approved?

No. The application was lapsed on 7 Nov 2026, so it is no longer under consideration.

Where is it?

In Pandharwani, Khairlanji, Balaghat, Madhya Pradesh.

How big is it?

It has a stated cost of ₹2 crore and a site of 36.8 acres.

When was it filed?

The application was filed on 3 Sept 2026.

Project details

Official titleobtaining Environmental Clearance for proposed capacity expansion from 60000 TPA of Manganese ore to total ROM of 79871.20 TPA (Manganese Ore = 75357.8 TPA, waste-547.20TPA and Reject = 3966.2 TPA) at Village: Pandharwani, Tehsil- Khairlanji & Dist. Balaghat (MP) by M/s D. P. Rai
StatusLapsed
Status since7 Nov 2026
Application filed3 Sept 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorMining
ApplicantD P Rai
Land area36.8 acres (14.9 ha)
Project cost₹2 crore
Village / localityPandharwani
Taluk / tehsilKhairlanji
DistrictBalaghat
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-08264

In context

204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 36.8 acres, this one is larger than 81% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 42.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.

Where it is

Pandharwani, Khairlanji, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.