Project details
| Official title | Increase in Clinker Production From 4 Million Tpa to 8.5 Million Tpa Through Addition of New Unit (Line-Ii) of 4.5 Million Tpa of Clinker and Power Generation Through Whrb From 12.25 MW to 32.25 MW Along With Exiting Cement Production of 5.0mtpa |
|---|---|
| Status | More information requested |
| Status since | 20 Nov 2026 |
| Application filed | 27 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | RCCPL Private Limited |
| Land area | 443.8 acres (179.6 ha) |
| Project cost | ₹4,700 crore |
| Village / locality | Sannai |
| Taluk / tehsil | Maihar |
| District | Satna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07710 |
In context
5 applications in Satna since January 2022 are in the same category (Industry): 0 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sannai, Maihar, Satna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Increase in Clinker Production From 4 Million Tpa to 8.5 Million Tpa Through… — under environmental review, 0 m away
- Change in Land Use in Favour of M/S Rccpl PVT. LTD. for Second Conveyor Belt… — under forest review, 5 km away
- Satna Bansagar Mvs — forest land use approved, 5.4 km away
- Sannai Flagstone Mine of Ramkumar Singh Gond — lapsed, 6.1 km away
- Sannai Flagstone Mine of Ramkumar Singh Gond — lapsed, 6.1 km away
- Sannai Flagstone Mine of Shri Ramkumar Singh Gond-1.578ha. — environmental approval granted, 6.1 km away
- Limestone Mine 889.76 Hectare Village Jamuani Khurd, Chari, Durjanpur, and… — environmental approval granted, 7.4 km away
- Limestone Mine 889.76 Hectare Village Jamuani Khurd, Chari, Durjanpur, and… — environmental approval granted, 7.4 km away
More from RCCPL Private Limited in Satna
- Forest Clearance in Favour of M/S Rccpl PVT. LTD. for Diverting 24.24 Hect.… — under forest review
- Itoura Limestone Mining with 0.8 MTPA capacity at villages Itoura, Bachwai,… — environmental approval granted
- Change in Land Use in Favour of M/S Rccpl PVT. LTD. for Second Conveyor Belt… — under forest review
- Increase in Clinker Production From 4 Million Tpa to 8.5 Million Tpa Through… — under environmental review
- Limestone Mine 889.76 Hectare Village Jamuani Khurd, Chari, Durjanpur, and… — environmental approval granted
- Limestone Mine 889.76 Hectare Village Jamuani Khurd, Chari, Durjanpur, and… — environmental approval granted