Quick answers
What is Basaniya Stone Quarry?
Basaniya Stone Quarry is a proposed mining project in Basniya, Manasa, Neemuch, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Sanjay.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Basniya, Manasa, Neemuch, Madhya Pradesh.
How big is it?
It has a stated cost of ₹69 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 25 Sept 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 25 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Sanjay |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹69 lakh |
| Village / locality | Basniya |
| Taluk / tehsil | Manasa |
| District | Neemuch |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08131 |
In context
122 applications in Neemuch since January 2022 are in the same category (Mining): 63 approved, 23 filed or under review, and 36 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 86% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Basniya, Manasa, Neemuch, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Singhadiya Pipliya Stone (Gitti) Quarry — initial checks, 4 km away
- SINGADIYA PIPLIYA STONE (GITTI) QUARRY-Fresh — lapsed, 4 km away
- Singadiya Pipalya Stone Quarry — not approved, 4 km away
- Singadiya Pipalya Stone Quarry — environmental approval granted, 4 km away
- 400 KV D/C Quad Transmission Line From Mp01 Irep Psp Switch Yard at Rampura,… — forest land use approved, 5.7 km away
- Gandhi Sagar 2 Multi-Villages Scheme Trial and Operations & Maintenance of the… — forest land use approved, 12.9 km away
- Gandhi Sagar 2 Multi-Villages Scheme — forest land use approved, 13.9 km away
- Gandhi Sagar 2 Multi -Villages Scheme, District Mandsaur & Neemuch in Single… — forest land use approved, 14.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.