Quick answers
What is this project?
400 KV D/C Quad Transmission Line From Mp01 Irep Psp Switch Yard at Rampura, to Proposed Powergrid 400 KV Mandsaur Ps, Rampura Range, Neemuch Forest Division, Madhya Pradesh is an approved power project in Ambakheri, Manasa, Neemuch, Madhya Pradesh. The site covers 3,394.9 acres.
Who is building it?
The applicant is Greenko Mp01 Irep Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 4 May 2026), as of 27 Nov 2026.
Where is it?
In Ambakheri, Manasa, Neemuch, Madhya Pradesh.
How big is it?
It has a stated cost of ₹309.5 crore; a site of 3,394.9 acres and 85.5 acres (34.6 ha) of forest land.
When was it filed?
The application was filed on 23 Jun 2024.
Project details
| Official title | Construction of 400 KV D/C Quad Transmission Line From Mp01 Irep Psp Switch Yard at Rampura, to Proposed Powergrid 400 KV Mandsaur Ps, Rampura Range, Neemuch Forest Division, Madhya Pradesh |
|---|---|
| Status | Forest land use approved |
| Status since | 4 May 2026 |
| Application filed | 23 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Greenko Mp01 Irep Private Limited |
| Land area | 3,394.9 acres (1,373.9 ha) |
| Forest land | 85.5 acres (34.6 ha) |
| Project cost | ₹309.5 crore |
| Village / locality | Ambakheri |
| Taluk / tehsil | Manasa |
| District | Neemuch |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10862 |
In context
15 applications in Neemuch since January 2022 are in the same category (Power): 7 approved, 2 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 3,394.9 acres, this one is larger than 50% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambakheri, Manasa, Neemuch, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Singadiya Pipalya Stone Quarry — not approved, 1.7 km away
- Singadiya Pipalya Stone Quarry — environmental approval granted, 1.7 km away
- Singhadiya Pipliya Stone (Gitti) Quarry — initial checks, 1.7 km away
- SINGADIYA PIPLIYA STONE (GITTI) QUARRY-Fresh — lapsed, 1.7 km away
- Basaniya Stone Quarry — under environmental review, 5.7 km away
- Barthun Stone Quarry — environmental approval granted, 13.1 km away
- Deori Khawasa (Gitti and M-Sand) Quarry — environmental approval granted, 13.3 km away
- Deori Khawasa (Gitti and M-Sand) Quarry — cleared for impact study, 13.3 km away
More from Greenko Mp01 Irep Private Limited in Neemuch
- MP30 Gandhi Sagar Standalone Pumped Storage Project — environmental approval granted
- MP30 Gandhi Sagar Off-Stream PSP falling under Rampura Pathar R.F, Neemuch… — forest land use approved
- 400 KV D/C Quad Moose Transmission line from MP01 IREP PSP Switch Yard at… — lapsed
All 5 Greenko Mp01 Irep projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.