Quick answers
What is this project?
Badagaon Off-Stream Close Loop Pumped Storage Project (1000 MW) is a proposed water and irrigation project in Baragaon, Teonthar, Rewa, Madhya Pradesh. The site covers 3,814.4 acres.
Who is building it?
The applicant is Renew Green (Tnj Two) Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Baragaon, Teonthar, Rewa, Madhya Pradesh.
How big is it?
It has a stated cost of ₹4,982.7 crore and a site of 3,814.4 acres.
When was it filed?
The application was filed on 30 Apr 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Badagaon Off-Stream Close Loop Pumped Storage Project (1000 MW)
Project details
| Status | Under environmental review |
|---|---|
| Status since | 8 Jun 2026 |
| Application filed | 30 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Renew Green (Tnj Two) Private Limited |
| Land area | 3,814.4 acres (1,543.6 ha) |
| Project cost | ₹4,982.7 crore |
| Village / locality | Baragaon |
| Taluk / tehsil | Teonthar |
| District | Rewa |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08390 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Sept 2026 | Forest land use approved | 19,950.5 acres | ₹4,982.7 crore |
| Early planning filed 30 Apr 2026 (this page) | Under environmental review | 3,814.4 acres | ₹4,982.7 crore |
In context
12 applications in Rewa since January 2022 are in the same category (Water & irrigation): 6 approved, 6 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3,814.4 acres, this one is smaller than 58% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baragaon, Teonthar, Rewa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Badagaon Off-Stream Close Loop Pumped Storage Project (1000 MW) — forest land use approved, 250 m away
- No Increase in Pollution Load due to proposed change in product mix with… — initial checks, 4.2 km away
- Greenfield Project of 120 KLPD Grain Based Ethanol Plant — environmental approval granted, 4.2 km away
- Mahewa Stone Mine — lapsed, 4.2 km away
- Mahewa Stone Mine — lapsed, 4.6 km away
- Mahewa Stone Quarry — lapsed, 4.7 km away
- Mahewa Stone Mine — lapsed, 4.7 km away
- Mahewa Stone Quarry — lapsed, 4.8 km away
All 3 Renew Green (Tnj Two) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.