Quick answers
What is this project?
New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super Critical Thermal Power Plant by Torrent Power Limited is an approved power project in Kolml, Anuppur, Madhya Pradesh. The site covers 844.7 acres.
Who is building it?
The applicant is Torrent Power Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Sept 2026), as of 27 Nov 2026.
Where is it?
In Kolml, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹23,740 crore and a site of 844.7 acres.
When was it filed?
The application was filed on 23 Jun 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super Critical Thermal…
Project details
| Official title | New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super Critical Thermal Power Plant at village Raksha, Kolmi and Daikhal, Tehsil Anuppur, Anuppur District, Madhya Pradesh by Torrent Power Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 7 Sept 2026 |
| Application filed | 23 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Torrent Power Limited |
| Land area | 844.7 acres (341.9 ha) |
| Project cost | ₹23,740 crore |
| Village / locality | Kolml |
| Taluk / tehsil | Anuppur |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08450 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 23 Jun 2026 (this page) | Environmental approval granted | 844.7 acres | ₹23,740 crore |
| New project filed 23 Feb 2026 | Environmental approval granted | 844.7 acres | ₹23,740 crore |
| Early planning filed 16 Sept 2025 | Cleared for impact study | 844.7 acres | ₹23,740 crore |
In context
34 applications in Anuppur since January 2022 are in the same category (Power): 13 approved, 7 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 844.7 acres, this one is larger than 58% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kolml, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super… — environmental approval granted, 0 m away
- New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super… — cleared for impact study, 0 m away
- Proposed Railway corridor for Newzone India Private Limited (Expansion of… — lapsed, 0 m away
- Newzone India Pvt Limited proposed expansion of additional 1x800 MW Ultra… — under environmental review, 50 m away
- Newzone India Pvt Limited proposed expansion of additional 1x800 MW Ultra… — returned to applicant, 50 m away
- Construction of Approach Road From Raksha to Kolmi — more information requested, 1.3 km away
- Proposed Railway corridor for Newzone India Private Limited near Dhurwasin… — initial checks, 2 km away
- Dekhal Sand Mine — environmental approval granted, 3.7 km away
More from Torrent Power Limited in Anuppur
- Proposed Railway corridor for Newzone India Private Limited near Dhurwasin… — initial checks
- Proposed Railway corridor for Newzone India Private Limited (Expansion of… — lapsed
5 Torrent Power projects in Anuppur
All 28 Torrent Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.