Proposed Railway corridor for Newzone India Private Limited (Expansion of 1x800 MW USCTPP) near Dhurwasin Railway Station. Village Dhurwasin is a lapsed building project in Kotma R F, Anuppur, Madhya Pradesh. It seeks 6 acres of forest land.
Who is building it?
The applicant is Torrent Power Limited.
Has it been approved?
No. The application was lapsed on 2 Sept 2026, so it is no longer under consideration.
Where is it?
In Kotma R F, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹250 crore and 6 acres (2.4 ha) of forest land.
When was it filed?
The application was filed on 17 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Sept 2026 |
| Application filed | 17 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Torrent Power Limited |
| Forest land | 6 acres (2.4 ha) |
| Project cost | ₹250 crore |
| Village / locality | Kotma R F |
| Taluk / tehsil | Anuppur |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10336 |
In context
20 applications in Anuppur since January 2022 are in the same category (Buildings & townships): 1 approved, 2 filed or under review, and 17 withdrawn, lapsed or rejected.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kotma R F, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super… — environmental approval granted, 0 m away
- New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super… — environmental approval granted, 0 m away
- New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super… — cleared for impact study, 0 m away
- Newzone India Pvt Limited proposed expansion of additional 1x800 MW Ultra… — under environmental review, 50 m away
- Newzone India Pvt Limited proposed expansion of additional 1x800 MW Ultra… — returned to applicant, 50 m away
- Construction of Approach Road From Raksha to Kolmi — more information requested, 1.3 km away
- Proposed Railway corridor for Newzone India Private Limited near Dhurwasin… — initial checks, 2 km away
- Dekhal Sand Mine — environmental approval granted, 3.7 km away
More from Torrent Power Limited in Anuppur
- Proposed Railway corridor for Newzone India Private Limited near Dhurwasin… — initial checks
- New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super… — environmental approval granted
- New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super… — environmental approval granted
- New Zone Thermal Power Plant, Anuppur, 2x800 MW Coal Based Ultra Super… — cleared for impact study
5 Torrent Power projects in Anuppur
All 28 Torrent Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.