Quick answers
What is this project?
Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd is an approved project in Thorha, Kotma, Anuppur, Madhya Pradesh. The site covers 2,545.2 acres.
Who is building it?
The applicant is Acc Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Apr 2026), as of 27 Nov 2026.
Where is it?
In Thorha, Kotma, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1,012.8 crore; a site of 2,545.2 acres and 753.2 acres (304.8 ha) of forest land.
When was it filed?
The application was filed on 4 Sept 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Apr 2026 |
| Application filed | 4 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Acc Limited |
| Land area | 2,545.2 acres (1,030 ha) |
| Forest land | 753.2 acres (304.8 ha) |
| Project cost | ₹1,012.8 crore |
| Village / locality | Thorha |
| Taluk / tehsil | Kotma |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09165 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Aug 2026 | Under environmental review | 2,545.2 acres | ₹1,012.8 crore |
| New project filed 4 Sept 2024 (this page) | Forest land use approved | 2,545.2 acres | ₹1,012.8 crore |
In context
10 applications in Anuppur since January 2022 are in the same category (Other): 4 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. At 2,545.2 acres, this one is larger than 80% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thorha, Kotma, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — under environmental review, 0 m away
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — forest land use approved, 0 m away
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — cleared for impact study, 0 m away
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — under forest review, 0 m away
- Baskhala Stone Quarry, Area-1.808 Ha, Khasra No 32/1, Village- Baskhala,… — lapsed, 1.2 km away
- Urtan North Coal Block (Normative Capacity: 0.6 MTPA, PRC: 0.90 MTPA) &… — environmental approval granted, 1.5 km away
- Baskhala Boulder Stone Mine — environmental approval granted, 1.9 km away
- Mauhari Stone Mine — lapsed, 2.5 km away
More from Acc Limited in Anuppur
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — forest land use approved
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — cleared for impact study
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — under forest review
5 Acc projects in Anuppur
All 24 Acc projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.