Quick answers
What is this project?
Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd is a proposed mining project in Manbhari, Kotma, Anuppur, Madhya Pradesh. The site covers 2,545.2 acres.
Who is building it?
The applicant is Acc Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Manbhari, Kotma, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1,012.8 crore; a site of 2,545.2 acres and 753.2 acres (304.8 ha) of forest land.
When was it filed?
The application was filed on 17 Mar 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd
Project details
| Status | Under forest review |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 17 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Acc Limited |
| Land area | 2,545.2 acres (1,030 ha) |
| Forest land | 753.2 acres (304.8 ha) |
| Project cost | ₹1,012.8 crore |
| Village / locality | Manbhari |
| Taluk / tehsil | Kotma |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11655 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Apr 2026 | Forest land use approved | 2,545.2 acres | ₹1,012.8 crore |
| Early planning filed 25 Mar 2026 | Cleared for impact study | 2,545.2 acres | ₹1,012.8 crore |
| New project filed 17 Mar 2026 (this page) | Under forest review | 2,545.2 acres | ₹1,012.8 crore |
In context
134 applications in Anuppur since January 2022 are in the same category (Mining): 45 approved, 29 filed or under review, and 60 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2,545.2 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.
Where it is
Manbhari, Kotma, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — under environmental review, 0 m away
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — forest land use approved, 0 m away
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — cleared for impact study, 0 m away
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — forest land use approved, 0 m away
- Baskhala Stone Quarry, Area-1.808 Ha, Khasra No 32/1, Village- Baskhala,… — lapsed, 1.2 km away
- Urtan North Coal Block (Normative Capacity: 0.6 MTPA, PRC: 0.90 MTPA) &… — environmental approval granted, 1.5 km away
- Baskhala Boulder Stone Mine — environmental approval granted, 1.9 km away
- Mauhari Stone Mine — lapsed, 2.5 km away
More from Acc Limited in Anuppur
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — under environmental review
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — forest land use approved
5 Acc projects in Anuppur
All 24 Acc projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.