What is Developing? Open the mapMap

Under forest reviewMining · Anuppur, Madhya Pradesh

Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd

Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd is a proposed mining project in Manbhari, Kotma, Anuppur, Madhya Pradesh. The site covers 2,545.2 acres. Its stated project cost is ₹1,012.8 crore. As of 27 Nov 2026, its status is “Under forest review” (since 18 Nov 2026).

See it on the live map All projects in Anuppur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd is a proposed mining project in Manbhari, Kotma, Anuppur, Madhya Pradesh. The site covers 2,545.2 acres.

Who is building it?

The applicant is Acc Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Manbhari, Kotma, Anuppur, Madhya Pradesh.

How big is it?

It has a stated cost of ₹1,012.8 crore; a site of 2,545.2 acres and 753.2 acres (304.8 ha) of forest land.

When was it filed?

The application was filed on 17 Mar 2026.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd

Project details

StatusUnder forest review
Status since18 Nov 2026
Application filed17 Mar 2026
Approval soughtForest land use
Application typeNew project
SectorMining
ApplicantAcc Limited
Land area2,545.2 acres (1,030 ha)
Forest land753.2 acres (304.8 ha)
Project cost₹1,012.8 crore
Village / localityManbhari
Taluk / tehsilKotma
DistrictAnuppur
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-11655

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 9 Apr 2026Forest land use approved2,545.2 acres₹1,012.8 crore
Early planning filed 25 Mar 2026Cleared for impact study2,545.2 acres₹1,012.8 crore
New project filed 17 Mar 2026 (this page)Under forest review2,545.2 acres₹1,012.8 crore

In context

134 applications in Anuppur since January 2022 are in the same category (Mining): 45 approved, 29 filed or under review, and 60 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2,545.2 acres, this one is larger than 94% of them.

No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.

Where it is

Manbhari, Kotma, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Acc Limited in Anuppur

5 Acc projects in Anuppur
All 24 Acc projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.