Quick answers
What is this project?
Vups on 4-Laning of Bhopal - Biaora Section of NH-12 From Mubarakpur at Km 324.00 to Bioara Km 423.00 in State of Madhya Pradesh on Epc Mode (Package-Ii) is a lapsed road project in Dhamdor, Narsinghgarh, Rajgarh, Madhya Pradesh. The site covers 56.8 acres.
Who is building it?
The applicant is National Highway Authority of India.
Has it been approved?
No. The application was lapsed on 24 Oct 2025, so it is no longer under consideration.
Where is it?
In Dhamdor, Narsinghgarh, Rajgarh, Madhya Pradesh.
How big is it?
It has a stated cost of ₹776.9 crore; a site of 56.8 acres and 24.8 acres (10 ha) of forest land.
When was it filed?
The application was filed on 18 Sept 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Vups on 4-Laning of Bhopal - Biaora Section of NH-12 From Mubarakpur at Km 324.00 to…
Project details
| Official title | Construction of Vups on 4-Laning of Bhopal - Biaora Section of NH-12 From Mubarakpur at Km 324.00 to Bioara Km 423.00 in State of Madhya Pradesh on Epc Mode (Package-Ii). |
|---|---|
| Status | Lapsed |
| Status since | 24 Oct 2025 |
| Application filed | 18 Sept 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Land area | 56.8 acres (23 ha) |
| Forest land | 24.8 acres (10 ha) |
| Project cost | ₹776.9 crore |
| Village / locality | Dhamdor |
| Taluk / tehsil | Narsinghgarh |
| District | Rajgarh |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09293 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 18 Sept 2025 (this page) | Lapsed | 56.8 acres | ₹776.9 crore |
| New project filed 12 Jul 2025 | Forest land use approved | 56.8 acres | ₹776.9 crore |
| New project filed 12 Jul 2025 | Decision issued | 56.8 acres | ₹776.9 crore |
In context
10 applications in Rajgarh since January 2022 are in the same category (Roads & highways): 3 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 56.8 acres, this one is larger than 80% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhamdor, Narsinghgarh, Rajgarh, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vups on 4-Laning of Bhopal - Biaora Section of NH-12 From Mubarakpur at Km… — forest land use approved, 0 m away
- Vups on 4-Laning of Bhopal - Biaora Section of NH-12 From Mubarakpur at Km… — decision issued, 0 m away
- Percolation Tank in Janpad Panchayat Narsinghgarh Distrct Rajgarh — more information requested, 1.7 km away
- Retrofitting Piped Water Supply Scheme, Devgarh — more information requested, 3.7 km away
- Retrofitting Piped Water Supply Scheme, Devgarh — more information requested, 3.7 km away
- Aanganwadi building — more information requested, 3.9 km away
- Kantoda Bypass Road, Rajgarh — more information requested, 5.9 km away
- Construction of City portion Narsinghgarh Road, District Rajgarh — more information requested, 5.9 km away
3 National Highways Authority of India (NHAI) projects in Rajgarh
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.