What is Developing? Open the mapMap

Forest land use approvedRoads & highways · Rajgarh, Madhya Pradesh

Vups on 4-Laning of Bhopal - Biaora Section of NH-12 From Mubarakpur at Km 324.00 to Bioara Km 423.00 in State of Madhya Pradesh on Epc Mode (Package-Ii)

Vups on 4-Laning of Bhopal - Biaora Section of NH-12 From Mubarakpur at Km 324.00 to Bioara Km 423.00 in State of Madhya Pradesh on Epc Mode (Package-Ii) is an approved road project in Dhamdor, Narsinghgarh, Rajgarh, Madhya Pradesh. The site covers 56.8 acres. Its stated project cost is ₹776.9 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 17 Apr 2026).

See it on the live map All projects in Rajgarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Vups on 4-Laning of Bhopal - Biaora Section of NH-12 From Mubarakpur at Km 324.00 to Bioara Km 423.00 in State of Madhya Pradesh on Epc Mode (Package-Ii) is an approved road project in Dhamdor, Narsinghgarh, Rajgarh, Madhya Pradesh. The site covers 56.8 acres.

Who is building it?

The applicant is National Highway Authority of India.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 17 Apr 2026), as of 27 Nov 2026.

Where is it?

In Dhamdor, Narsinghgarh, Rajgarh, Madhya Pradesh.

How big is it?

It has a stated cost of ₹776.9 crore; a site of 56.8 acres and 2.2 acres (0.9 ha) of forest land.

When was it filed?

The application was filed on 12 Jul 2025.

Project details

Official titleConstruction of Vups on 4-Laning of Bhopal - Biaora Section of NH-12 From Mubarakpur at Km 324.00 to Bioara Km 423.00 in State of Madhya Pradesh on Epc Mode (Package-Ii).
StatusForest land use approved
Status since17 Apr 2026
Application filed12 Jul 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantNational Highway Authority of India
Land area56.8 acres (23 ha)
Forest land2.2 acres (0.9 ha)
Project cost₹776.9 crore
Village / localityDhamdor
Taluk / tehsilNarsinghgarh
DistrictRajgarh
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-11422

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Change of use filed 18 Sept 2025Lapsed56.8 acres₹776.9 crore
New project filed 12 Jul 2025 (this page)Forest land use approved56.8 acres₹776.9 crore
New project filed 12 Jul 2025Decision issued56.8 acres₹776.9 crore

In context

10 applications in Rajgarh since January 2022 are in the same category (Roads & highways): 3 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 56.8 acres, this one is larger than 80% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dhamdor, Narsinghgarh, Rajgarh, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

3 National Highways Authority of India (NHAI) projects in Rajgarh
All 548 National Highways Authority of India (NHAI) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.