Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 22 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Pgmtd Bsnl Bhopal |
| Land area | 1,100 m² |
| Forest land | 1,110 m² |
| Project cost | ₹3 lakh |
| Village / locality | Khamariya Khurd |
| Taluk / tehsil | Silwani |
| District | Raisen |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09302 |
In context
12 applications in Raisen since January 2022 are in the same category (Telecom): 6 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.3 acres, this one is larger than 55% of them.
Where it is
Khamariya Khurd, Silwani, Raisen, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Narmada River Multi Village Drinking Water Supply Scheme, District - Raisen in… — forest land use approved, 8.8 km away
- Pratapgarh feeder of 11kv FSP — more information requested, 11 km away
- 11 KV Line Interconnection Work From Pratapgarh to Semra Khas Village Under… — lapsed, 11.1 km away
- Marheti feeder of 11kv FSP — under forest review, 12.3 km away
- Khamera Stone Quarry — under environmental review, 12.4 km away
- Khamera Crusher Stone Quarry Project — environmental approval granted, 12.6 km away
- Construction of Dam and Canal system of Tekapar Khurd Tank Project — forest land use approved, 13.2 km away
- Construction of Dam and Canal system of Tekapar Khurd Tank Project — lapsed, 13.2 km away
More from Pgmtd Bsnl Bhopal in Raisen
- Ofc Laying Work Form Hathidol Gp to Hathidol 4g Saturation Tower — forest land use approved
- Underground Ofc Laying Work for 4g Saturation, Mission-500 From Chainpur to… — forest land use approved
- UNDERGROUND OFC LAYING WORK FOR 4G SATURATION,MISSION-500 FROM BAMNAI GP to… — more information requested
- Underground Ofc Laying Work for 4g Saturation,mission-500 in Local Kosmi — forest land use approved
- 4G saturation/mission 500 — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.