Project details
| Status | More information requested |
|---|---|
| Status since | 25 Sept 2023 |
| Application filed | 25 Sept 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Pgmtd Bsnl Bhopal |
| Land area | 1,800 m² |
| Project cost | ₹5 lakh |
| Village / locality | Kesali |
| Taluk / tehsil | Silwani |
| District | Raisen |
| State | Madhya Pradesh |
| Location from | Site area on record |
| Our reference | WID-MP-11844 |
In context
11 applications in Raisen since January 2022 are in the same category (Other): 1 approved, 10 filed or under review, and 0 withdrawn, lapsed or rejected. At 0.4 acres, this one is smaller than 100% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kesali, Silwani, Raisen, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 11 K.v. From Village Kartoli To Surendra Patidar Land — lapsed, 3.1 km away
- 11 K.v. From Village Kartoli To Surendra Patidar Land — lapsed, 3.2 km away
- Gairatganj-Silwani Multi Village Drinking Water Supply Scheme, District -… — more information requested, 4.5 km away
- Construction of C.C. Road From Siyalwada to Dungariya Khurd. — more information requested, 4.8 km away
- Construction of C.C. Road From Siyalwada to Dungariya Khurd. — lapsed, 4.8 km away
- Construction of C.C. Road From Dehgaon-Bamhori Road to Belgaon. — more information requested, 4.9 km away
- Construction of C.C. Road From Dehgaon-Bamhori Road to Belgaon. — lapsed, 4.9 km away
- Gairatganj-Silwani Multi Village Drinking Water Supply Scheme, District -… — under wildlife review, 5.2 km away
More from Pgmtd Bsnl Bhopal in Raisen
- Ofc Laying Work Form Hathidol Gp to Hathidol 4g Saturation Tower — forest land use approved
- Underground Ofc Laying Work for 4g Saturation, Mission-500 From Chainpur to… — forest land use approved
- Underground Ofc Laying Work for 4g Saturation,mission-500 From Khamariya Khurd… — forest land use approved
- UNDERGROUND OFC LAYING WORK FOR 4G SATURATION,MISSION-500 FROM BAMNAI GP to… — more information requested
- Underground Ofc Laying Work for 4g Saturation,mission-500 in Local Kosmi — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.