Quick answers
What is Government of India- 4G Saturation Project -Singladeh?
Government of India- 4G Saturation Project -Singladeh is an approved telecom project in Singladev, Satwas, Dewas, Madhya Pradesh. The site covers 0.1 acres.
Who is building it?
The applicant is Raj Soni.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 6 Feb 2024), as of 27 Nov 2026.
Where is it?
In Singladev, Satwas, Dewas, Madhya Pradesh.
How big is it?
It has a site of 0.1 acres and 310 m² of forest land.
When was it filed?
The application was filed on 12 Dec 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 6 Feb 2024 |
| Application filed | 12 Dec 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Raj Soni |
| Land area | 300 m² |
| Forest land | 310 m² |
| Village / locality | Singladev |
| Taluk / tehsil | Satwas |
| District | Dewas |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09358 |
In context
20 applications in Dewas since January 2022 are in the same category (Telecom): 12 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.1 acres, this one is smaller than 83% of them.
Where it is
Singladev, Satwas, Dewas, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Government of India- 4G Saturation Project -Semlinarwada — lapsed, 14 km away
- 4G Saturation Project- Semlinarwada — forest land use approved, 14 km away
- Government of India- 4G Saturation Project - Premgarh — lapsed, 14.6 km away
- 4G saturation Project -Preamgarh — forest land use approved, 14.6 km away
- Water Supply Scheme of Kantaphod and Loharda Town — forest land use approved, 18.6 km away
- Water Supply Scheme of Kantaphod and Loharda Town — lapsed, 18.6 km away
- Polakhal Marble, Low-grade Lime & Subgrade Mineral Quarry — lapsed, 18.8 km away
- Polakhal Marble, Low-grade Lime & Subgrade Mineral Quarry — cleared for impact study, 18.8 km away
More from Raj Soni in Dewas
- Government of India- 4G Saturation Project - Magaradeh — lapsed
- Government of India- 4G Saturation Project - BADCHHAPRA — lapsed
- Government of India- 4G Saturation Project -Semlinarwada — lapsed
- Government of India- 4G Saturation Project - MAL KEDIYA — lapsed
- Government of India- 4G Saturation Project - Premgarh — lapsed
- Government of India- 4G Saturation Project - Patadipala — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.