Quick answers
What is Government of India- 4G Saturation Project - Magaradeh?
Government of India- 4G Saturation Project - Magaradeh is a lapsed telecom project in Mukundgarh, Bagli, Dewas, Madhya Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Raj Soni.
Has it been approved?
No. The application was lapsed on 1 Dec 2023, so it is no longer under consideration.
Where is it?
In Mukundgarh, Bagli, Dewas, Madhya Pradesh.
How big is it?
It has a site of 0 acres and 80 m² of forest land.
When was it filed?
The application was filed on 24 Jan 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Dec 2023 |
| Application filed | 24 Jan 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Raj Soni |
| Land area | 100 m² |
| Forest land | 80 m² |
| Village / locality | Mukundgarh |
| Taluk / tehsil | Bagli |
| District | Dewas |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09359 |
In context
20 applications in Dewas since January 2022 are in the same category (Telecom): 12 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mukundgarh, Bagli, Dewas, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project- Magaradeh — forest land use approved, 0 m away
- Diversion of 0.0232 Ha of Forest Land for Construction of Mobile Tower at… — under forest review, 300 m away
- 132KV DCSS line from 132KV S/s Sivni to 132KV S/s Kishangarh — more information requested, 1.7 km away
- Ambapani Pumped Storage Project — under environmental review, 3.5 km away
- Patadipala To Lohara pipliya Whya Udaipura road — lapsed, 3.6 km away
- Government of India- 4G Saturation Project - Patadipala — lapsed, 5.8 km away
- 4G Saturation Project — forest land use approved, 5.8 km away
- Patpadi Tank Project Pipeline — more information requested, 5.9 km away
More from Raj Soni in Dewas
- Government of India- 4G Saturation Project - BADCHHAPRA — lapsed
- Government of India- 4G Saturation Project -Semlinarwada — lapsed
- Government of India- 4G Saturation Project - MAL KEDIYA — lapsed
- Government of India- 4G Saturation Project - Premgarh — lapsed
- Government of India- 4G Saturation Project - Patadipala — lapsed
- Government of India- 4G Saturation Project -Singladeh — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.