Diversion of 0.0232 Ha of Forest Land for Construction of Mobile Tower at Magaradeh is a proposed telecom project in Makadiya, Bagli, Dewas, Madhya Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Indus Towers LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Makadiya, Bagli, Dewas, Madhya Pradesh.
How big is it?
It has a stated cost of ₹20 lakh; a site of 0 acres and 230 m² of forest land.
When was it filed?
The application was filed on 17 May 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 8 Sept 2026 |
| Application filed | 17 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Indus Towers LTD |
| Land area | 200 m² |
| Forest land | 230 m² |
| Project cost | ₹20 lakh |
| Village / locality | Makadiya |
| Taluk / tehsil | Bagli |
| District | Dewas |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09390 |
In context
20 applications in Dewas since January 2022 are in the same category (Telecom): 12 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0 acres, this one is smaller than 89% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Makadiya, Bagli, Dewas, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Government of India- 4G Saturation Project - Magaradeh — lapsed, 300 m away
- 4G Saturation Project- Magaradeh — forest land use approved, 300 m away
- 132KV DCSS line from 132KV S/s Sivni to 132KV S/s Kishangarh — more information requested, 1.8 km away
- Ambapani Pumped Storage Project — under environmental review, 3.4 km away
- Patadipala To Lohara pipliya Whya Udaipura road — lapsed, 3.6 km away
- Government of India- 4G Saturation Project - Patadipala — lapsed, 5.7 km away
- 4G Saturation Project — forest land use approved, 5.7 km away
- Patpadi Tank Project Pipeline — more information requested, 6.1 km away
All 165 Indus Towers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.