Quick answers
What is this project?
Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority Karonda Ryt.-Bajag route DFO Dindori is a lapsed road project in Amadongari, Dindori, Madhya Pradesh. The site covers 0.1 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
No. The application was lapsed on 30 Mar 2024, so it is no longer under consideration.
Where is it?
In Amadongari, Dindori, Madhya Pradesh.
How big is it?
It has a stated cost of ₹16 lakh; a site of 0.1 acres and 1.6 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 15 Aug 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Mar 2024 |
| Application filed | 15 Aug 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 400 m² |
| Forest land | 1.6 acres (0.6 ha) |
| Project cost | ₹16 lakh |
| Village / locality | Amadongari |
| Taluk / tehsil | Dindori |
| District | Dindori |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09450 |
In context
6 applications in Dindori since January 2022 are in the same category (Roads & highways): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amadongari, Dindori, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sindhpur Ryt Crusher Stone Quarry of Smt Sumitra Chouksey — environmental approval granted, 1.3 km away
- Pipariya Mal Bauxite Block (ML Area 273.215 Ha) — under forest review, 4.8 km away
- Pipariya Mal Bauxite Block (Lease Area; 273.215 Ha); Village - Pipariya… — cleared for impact study, 4.8 km away
- Jalda (S.E.) Aluminous Laterite and Bauxite Block (Composite Licence) — forest land use approved, 5.5 km away
- Jalda (S.E.) Aluminous Laterite and Bauxite Block (Composite Licence) — lapsed, 5.5 km away
- Pipariyamal West Bauxite Block — under forest review, 5.9 km away
- 41.63ha Pipariyamal West Bauxite Block — cleared for impact study, 5.9 km away
- Lalpur Mal Crusher Stone Quarry, Area- 2.0 Ha, Khasra No- 813 Part, Village-… — lapsed, 6.3 km away
More from Jio Digital Fibre Private LTD in Dindori
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed
3 Jio Digital Fibre projects in Dindori
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.