Quick answers
What is this project?
Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal Road Authority Manikpur (Bhamha)-Chaurai Khurd Route Dfo Dindori is a lapsed telecom project in Barbaspur, Shahpura, Dindori, Madhya Pradesh. The site covers 1.9 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
No. The application was lapsed on 17 Apr 2025, so it is no longer under consideration.
Where is it?
In Barbaspur, Shahpura, Dindori, Madhya Pradesh.
How big is it?
It has a stated cost of ₹20 lakh; a site of 1.9 acres and 2,500 m² of forest land.
When was it filed?
The application was filed on 24 Dec 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Apr 2025 |
| Application filed | 24 Dec 2022 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 1.9 acres (0.8 ha) |
| Forest land | 2,500 m² |
| Project cost | ₹20 lakh |
| Village / locality | Barbaspur |
| Taluk / tehsil | Shahpura |
| District | Dindori |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09960 |
In context
8 applications in Dindori since January 2022 are in the same category (Telecom): 4 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Barbaspur, Shahpura, Dindori, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tikrakhamhariya Murrum & Crusher Stone Temporary Permit — environmental approval granted, 10.3 km away
- Bhardwara Mal Stone (Gitty) Quarry — environmental approval granted, 16.7 km away
- Shahpura Mehandwani Mvs — forest land use approved, 26.4 km away
- Shahpura Mehandwani Mvs — lapsed, 26.4 km away
- Shahpura Mehandwani Mvs — lapsed, 26.4 km away
- Diversion of Forest Land Under FCA 1980 for Construction of Mehndwani Chakdehi… — forest land use approved, 38.1 km away
- Mehandwani stone Quarry — environmental approval granted, 38.8 km away
- Pakarbagharra Mal Crusher Stone Quarry — environmental approval granted, 40.7 km away
More from Jio Digital Fibre Private LTD in Dindori
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
3 Jio Digital Fibre projects in Dindori
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.