Quick answers
What is this project?
Under Ground Transmision Line for Lamta Pressurized Pipe Irrigation Network (Hose System) Project is an approved power project in P.F., Balaghat, Madhya Pradesh. The site covers 1.2 acres.
Who is building it?
The applicant is Uday Parte.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Jan 2026), as of 27 Nov 2026.
Where is it?
In P.F., Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1.4 crore; a site of 1.2 acres and 2,290 m² of forest land.
When was it filed?
The application was filed on 2 Sept 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Jan 2026 |
| Application filed | 2 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Uday Parte |
| Land area | 1.2 acres (0.5 ha) |
| Forest land | 2,290 m² |
| Project cost | ₹1.4 crore |
| Village / locality | P.F. |
| Taluk / tehsil | Balaghat |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09476 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Sept 2025 (this page) | Forest land use approved | 1.2 acres | ₹1.4 crore |
| New project filed 21 Aug 2025 | Lapsed | 1.2 acres | ₹1.4 crore |
In context
45 applications in Balaghat since January 2022 are in the same category (Power): 1 approved, 18 filed or under review, and 26 withdrawn, lapsed or rejected. At 1.2 acres, this one is smaller than 97% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
P.F., Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Under Ground Transmision Line for Lamta Pressurized Pipe Irrigation Network… — lapsed, 0 m away
- Bhalewada Sand Quarry — under environmental review, 1.9 km away
- Laying new 11 KV Feeder Charegaon under RDSS Scheme of Central Govt. — lapsed, 3.2 km away
- Laying New 11 KV Feeder (CHAREGAON AG ) to separate agriculture feeder — more information requested, 3.2 km away
- Laying New Charegaon AG Feeder under feeder separation project of RDSS scheme — application filed, 3.3 km away
- Laying New Charegaon AG Feeder under feeder separation project of RDSS scheme — under forest review, 3.3 km away
- Chhindlai Sand Quarry — under environmental review, 3.5 km away
- Laying new 11 KV feeder Charegaon under RDSS scheme — lapsed, 4 km away
More from Uday Parte in Balaghat