Quick answers
What is this project?
Laying New Charegaon AG Feeder under feeder separation project of RDSS scheme is a proposed power project in Mohgaon, Balaghat, Madhya Pradesh. The site covers 215.1 acres.
Who is building it?
The applicant is Babulal Bhaina.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Mohgaon, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹3.9 crore; a site of 215.1 acres and 8.7 acres (3.5 ha) of forest land.
When was it filed?
The application was filed on 25 Sept 2025.
Project details
| Status | Under forest review |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 25 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Babulal Bhaina |
| Land area | 215.1 acres (87.1 ha) |
| Forest land | 8.7 acres (3.5 ha) |
| Project cost | ₹3.9 crore |
| Village / locality | Mohgaon |
| Taluk / tehsil | Balaghat |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11507 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Apr 2026 | Application filed | 215.1 acres | ₹3.9 crore |
| New project filed 25 Sept 2025 (this page) | Under forest review | 215.1 acres | ₹3.9 crore |
In context
45 applications in Balaghat since January 2022 are in the same category (Power): 1 approved, 18 filed or under review, and 26 withdrawn, lapsed or rejected. At 215.1 acres, this one is larger than 85% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mohgaon, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying New Charegaon AG Feeder under feeder separation project of RDSS scheme — application filed, 0 m away
- Laying New 11 KV Feeder (CHAREGAON AG ) to separate agriculture feeder — more information requested, 100 m away
- Laying new 11 KV Feeder Charegaon under RDSS Scheme of Central Govt. — lapsed, 100 m away
- Laying new 11 KV feeder Charegaon under RDSS scheme — lapsed, 750 m away
- Bhalewada Sand Quarry — under environmental review, 2.5 km away
- Under Ground Transmision Line for Lamta Pressurized Pipe Irrigation Network… — forest land use approved, 3.3 km away
- Under Ground Transmision Line for Lamta Pressurized Pipe Irrigation Network… — lapsed, 3.3 km away
- Chhindlai Sand Quarry — under environmental review, 5.7 km away
More from Babulal Bhaina in Balaghat
- Laying New 11 KV Feeder Nagarwada Under Rdss Scheme of Central Govt — under forest review
- Laying New 11 KV Linga Agriculture Feeder — application filed
- Laying New 11 KV Feeder Batua Under Rdss Scheme of Central Government — lapsed
- Laying New 11 KV Feeder Kakodi MIX to separate agriculture feeder — lapsed
- Laying New 11 KV Feeder Risewada MIX to separate agriculture feeder — lapsed
- Laying New 11 kv Feeder ( Risewada AG) to separate agriculture Feeder — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.