Quick answers
What is Nirgud Lift Irrigation Project?
Nirgud Lift Irrigation Project is a proposed water and irrigation project in Bijasini, Athner, Betul, Madhya Pradesh. The site covers 243.3 acres.
Who is building it?
The applicant is Executive Engineer Water Resources Division No II Betul.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Bijasini, Athner, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1 crore; a site of 243.3 acres and 67.2 acres (27.2 ha) of forest land.
When was it filed?
The application was filed on 27 Apr 2025.
Project details
| Status | Under forest review |
|---|---|
| Status since | 15 Apr 2026 |
| Application filed | 27 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer Water Resources Division No II Betul |
| Land area | 243.3 acres (98.5 ha) |
| Forest land | 67.2 acres (27.2 ha) |
| Project cost | ₹1 crore |
| Village / locality | Bijasini |
| Taluk / tehsil | Athner |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09615 |
In context
8 applications in Betul since January 2022 are in the same category (Water & irrigation): 3 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bijasini, Athner, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Intake Well Approach Bridge, Ghoghari MVS District Betul (M.P.) — forest land use approved, 2.7 km away
- Permission For Construction of Mendha Multi Village Water Supply Pipeline Schem — lapsed, 3.6 km away
- Permission For Construction of Meda Multi Village Water Supply Pipeline Schem — more information requested, 4.3 km away
- Kolgaon Stone Quarry — initial checks, 5.1 km away
- Kolgaon Stone Quarry — environmental approval granted, 5.1 km away
- Nayak Charsi Stone Quarry — environmental approval granted, 5.4 km away
- Nayakcharsi Stone Quarry — environmental approval granted, 5.5 km away
- Nayakcharsi Stone Quarry — environmental approval granted, 5.8 km away
More from Executive Engineer Water Resources Division No II Betul in Betul
- Garha Medium Irrigation Project — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.