Quick answers
What is this project?
Permission For Construction of Meda Multi Village Water Supply Pipeline Schem is a proposed water and irrigation project in Amdar, Betul, Madhya Pradesh. The site covers 169.7 acres.
Who is building it?
The applicant is Rural Development.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Amdar, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹241 crore; a site of 169.7 acres and 20.9 acres (8.4 ha) of forest land.
When was it filed?
The application was filed on 17 Dec 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 17 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Rural Development |
| Land area | 169.7 acres (68.7 ha) |
| Forest land | 20.9 acres (8.4 ha) |
| Project cost | ₹241 crore |
| Village / locality | Amdar |
| Taluk / tehsil | Betul |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10580 |
In context
8 applications in Betul since January 2022 are in the same category (Water & irrigation): 3 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amdar, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission For Construction of Mendha Multi Village Water Supply Pipeline Schem — lapsed, 1.5 km away
- 4g Saturation Project Under Usof Fund at Villages- Laldhana, Adoumor,… — forest land use approved, 4.2 km away
- Nirgud Lift Irrigation Project — under forest review, 4.3 km away
- Nayak Charsi Stone Quarry — environmental approval granted, 4.8 km away
- Nayakcharsi Stone Quarry — environmental approval granted, 5 km away
- Nayakcharsi Stone Quarry — environmental approval granted, 5.2 km away
- Kolgaon Stone Quarry — environmental approval granted, 5.4 km away
- Kolgaon Stone Quarry — initial checks, 5.4 km away
More from Rural Development in Betul
- Permission For Construction of Ghogri Multi Village Water Supply Pipe Line Schem — more information requested
- Permission For Construction of Mendha Multi Village Water Supply Pipeline Schem — lapsed
- Water Treatment Plant & Solar Plant Village Sopai Th. Multai District Betul… — forest land use approved
- Intake Well Approach Bridge, Ghoghari MVS District Betul (M.P.) — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.