Quick answers
What is M/S Marshall Small Hydel Power Project?
M/S Marshall Small Hydel Power Project is a proposed water and irrigation project in Mahari, Sirmour, Rewa, Madhya Pradesh. The site covers 320.9 acres.
Who is building it?
The applicant is Katta Sitaram Reddy.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Mahari, Sirmour, Rewa, Madhya Pradesh.
How big is it?
It has a stated cost of ₹157 crore; a site of 320.9 acres and 16.3 acres (6.6 ha) of forest land.
When was it filed?
The application was filed on 2 Jan 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 15 May 2026 |
| Application filed | 2 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Katta Sitaram Reddy |
| Land area | 320.9 acres (129.9 ha) |
| Forest land | 16.3 acres (6.6 ha) |
| Project cost | ₹157 crore |
| Village / locality | Mahari |
| Taluk / tehsil | Sirmour |
| District | Rewa |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09616 |
In context
12 applications in Rewa since January 2022 are in the same category (Water & irrigation): 6 approved, 6 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 320.9 acres, this one is smaller than 75% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahari, Sirmour, Rewa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Purva Se Badidih Road Construction — lapsed, 3.3 km away
- M/S Kharauli Small Hydro Power Project — under forest review, 6 km away
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved, 9.2 km away
- Bamhani Gadiha Gitti & M. Sand mine (Area- 2.30 Ha.) — environmental approval granted, 12.2 km away
- Bhimbada Murum & M-Sand Mine, Area- 2.00 Ha. — environmental approval granted, 12.2 km away
- Industrial project by M/s. Shri Dadani Biofuels Private Ltd — environmental approval granted, 13.1 km away
- Rewa Semariya (S.H. 9) Basaman Mama Se Jadua Vaya Kakredi Mainaha Jarmohra… — more information requested, 14.9 km away
- Development of Kyoti fort, Dist Rewa — lapsed, 16.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.