What is M/S Kharauli Small Hydro Power Project?
M/S Kharauli Small Hydro Power Project is a proposed water and irrigation project in Patehara, Mangawan, Rewa, Madhya Pradesh. The site covers 12.4 acres.
Who is building it?
The applicant is Bhaskara Rao Barri.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Patehara, Mangawan, Rewa, Madhya Pradesh.
How big is it?
It has a stated cost of ₹19 crore; a site of 12.4 acres and 2.5 acres (1 ha) of forest land.
When was it filed?
The application was filed on 24 Jun 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 8 Jul 2026 |
| Application filed | 24 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Bhaskara Rao Barri |
| Land area | 12.4 acres (5 ha) |
| Forest land | 2.5 acres (1 ha) |
| Project cost | ₹19 crore |
| Village / locality | Patehara |
| Taluk / tehsil | Mangawan |
| District | Rewa |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09734 |
In context
12 applications in Rewa since January 2022 are in the same category (Water & irrigation): 6 approved, 6 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.4 acres, this one is smaller than 83% of them.
Where it is
Patehara, Mangawan, Rewa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S Marshall Small Hydel Power Project — more information requested, 6 km away
- Purva Se Badidih Road Construction — lapsed, 6.5 km away
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved, 9.7 km away
- Development of Kyoti fort, Dist Rewa — lapsed, 11.8 km away
- Bamhani Gadiha Gitti & M. Sand mine (Area- 2.30 Ha.) — environmental approval granted, 12.1 km away
- Bhimbada Murum & M-Sand Mine, Area- 2.00 Ha. — environmental approval granted, 12.1 km away
- Industrial project by M/s. Shri Dadani Biofuels Private Ltd — environmental approval granted, 13.5 km away