Quick answers
What is Construction of Kapildhara Approach Road Length 5.10 KM?
Construction of Kapildhara Approach Road Length 5.10 KM is a lapsed road project in Amarkantak, Pushparajgarh, Anuppur, Madhya Pradesh. The site covers 8.8 acres.
Who is building it?
The applicant is Eepwd Anuppur.
Has it been approved?
No. The application was lapsed on 25 Aug 2026, so it is no longer under consideration.
Where is it?
In Amarkantak, Pushparajgarh, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹10.2 crore; a site of 8.8 acres and 5.5 acres (2.2 ha) of forest land.
When was it filed?
The application was filed on 14 Aug 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Aug 2026 |
| Application filed | 14 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Eepwd Anuppur |
| Land area | 8.8 acres (3.6 ha) |
| Forest land | 5.5 acres (2.2 ha) |
| Project cost | ₹10.2 crore |
| Village / locality | Amarkantak |
| Taluk / tehsil | Pushparajgarh |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09679 |
In context
39 applications in Anuppur since January 2022 are in the same category (Roads & highways): 8 approved, 18 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 8.8 acres, this one is larger than 69% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amarkantak, Pushparajgarh, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bt. Road From Dhuna Aharam to Kabeer Chabura Road Length 0.30 Km — more information requested, 1.6 km away
- Widening to 2LPS of from junction of NH-45 near Kabir chabutra to Amarkantak… — lapsed, 1.8 km away
- Construction of Chabutra & Stair, Anuppur — lapsed, 2.2 km away
- Pushkar Dam To Jabalpur Road Pahuch Marg (Dakshin Tat) BT Road Construction — more information requested, 2.2 km away
- Kalyan Sewa Ashram Amarkantak — lapsed, 3.2 km away
- Electrification Work at Village Barsot(Damgarh) Under Pvtg Scheme — lapsed, 6.6 km away
- PWD road to Sarhakona — lapsed, 11.3 km away
- PWD road to Sarhakona — more information requested, 11.3 km away
More from Eepwd Anuppur in Anuppur
- Bt. Road From Dhuna Aharam to Kabeer Chabura Road Length 0.30 Km — more information requested
- Providing External Electrification in 11 KV LT Line and 11/0.4DTR Village… — lapsed
- Bhalmudi Rajnagar Road Length 4.60 KM — lapsed
- Providing External Electrification in 11 KV LT Line and 11/0.4 DTR Village… — lapsed
- Providing External Electrification in 11 KV LT Line and 11/0.4 DTR Village… — lapsed
- Approach road Funga-semaria to Pateratola- bartola- Dindori tola. — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.