Quick answers
What is Bhalmudi Rajnagar Road Length 4.60 KM?
Bhalmudi Rajnagar Road Length 4.60 KM is a lapsed road project in Bangaon, Kotma, Anuppur, Madhya Pradesh. The site covers 11.4 acres.
Who is building it?
The applicant is Eepwd Anuppur.
Has it been approved?
No. The application was lapsed on 2 May 2025, so it is no longer under consideration.
Where is it?
In Bangaon, Kotma, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹5.7 crore; a site of 11.4 acres and 5.4 acres (2.2 ha) of forest land.
When was it filed?
The application was filed on 28 Mar 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 May 2025 |
| Application filed | 28 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Eepwd Anuppur |
| Land area | 11.4 acres (4.6 ha) |
| Forest land | 5.4 acres (2.2 ha) |
| Project cost | ₹5.7 crore |
| Village / locality | Bangaon |
| Taluk / tehsil | Kotma |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11681 |
In context
39 applications in Anuppur since January 2022 are in the same category (Roads & highways): 8 approved, 18 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 11.4 acres, this one is larger than 83% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bangaon, Kotma, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Under Amrut 2.0 Scheme Overhead Tank — lapsed, 1.3 km away
- Kaya Kalp 1.O Bt Road From Police Station to Main Road — lapsed, 1.6 km away
- South Side of Jhiria West OCP — lapsed, 1.9 km away
- Used Water Management under sbm urabn 2.0 — lapsed, 2 km away
- Construction of Fulsay Dafai To Paw Mohalla Approch CC Road — forest land use approved, 2.7 km away
- Pipe Laying Work of Doomarkachhar Water Supply — lapsed, 2.9 km away
- BPCL for development of city Gas Distribution Network in the Geographical area… — forest land use approved, 3.3 km away
- Diversion of 0.752 Ha Forest Land for laying of the railway track from… — forest land use approved, 3.7 km away
More from Eepwd Anuppur in Anuppur
- Bt. Road From Dhuna Aharam to Kabeer Chabura Road Length 0.30 Km — more information requested
- Construction of Kapildhara Approach Road Length 5.10 KM — lapsed
- Providing External Electrification in 11 KV LT Line and 11/0.4DTR Village… — lapsed
- Providing External Electrification in 11 KV LT Line and 11/0.4 DTR Village… — lapsed
- Providing External Electrification in 11 KV LT Line and 11/0.4 DTR Village… — lapsed
- Approach road Funga-semaria to Pateratola- bartola- Dindori tola. — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.