Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Dec 2024 |
| Application filed | 21 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Piyush Mandraha |
| Land area | 114.9 acres (46.5 ha) |
| Forest land | 80.4 acres (32.6 ha) |
| Project cost | ₹3.4 crore |
| Village / locality | Matkuli |
| Taluk / tehsil | Pipariya |
| District | Hoshangabad |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09714 |
In context
5 applications in Hoshangabad since January 2022 are in the same category (Power): 0 approved, 0 filed or under review, and 5 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Matkuli, Pipariya, Hoshangabad, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New 11kV line from Denwa River to Singanama Village — lapsed, 1.2 km away
- New 11 kV line from Denwa River to Singanama — lapsed, 1.2 km away
- Renovation of 11 KV Line in Pachmarhi — lapsed, 1.6 km away
- Laying Under Ground Opticle Fiber Cable Unde Mission 500 Saturation Project in… — lapsed, 5 km away
- Ofc Laying for Bsnl 4g Tower Under Mission 500 Saturation Project of Govt. of… — lapsed, 5 km away
- Construction of Gram Pisua to Bindakheda road — initial checks, 6.7 km away
- Construction Of OLD MPM To Pachmarhi Road — initial checks, 9.1 km away
- Panari Murrum Quarry — lapsed, 14.1 km away
More from Piyush Mandraha in Hoshangabad
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.