LapsedPower · Hoshangabad, Madhya Pradesh

New 11kV line from Denwa River to Singanama Village

New 11kV line from Denwa River to Singanama Village is a lapsed power project in Singanama, Pipariya, Hoshangabad, Madhya Pradesh. The site covers 3.2 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 12 Oct 2025).

See it on the live map All projects in Hoshangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since12 Oct 2025
Application filed24 Sept 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantDinesh Singh Bhadoria
Land area3.2 acres (1.3 ha)
Forest land6.6 acres (2.7 ha)
Project cost₹1.5 crore
Village / localitySinganama
Taluk / tehsilPipariya
DistrictHoshangabad
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-11442

In context

5 applications in Hoshangabad since January 2022 are in the same category (Power): 0 approved, 0 filed or under review, and 5 withdrawn, lapsed or rejected.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Singanama, Pipariya, Hoshangabad, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dinesh Singh Bhadoria in Hoshangabad

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.