What is Developing? Open the mapMap

LapsedOther · Sidhi, Madhya Pradesh

Row for 4g Saturation Project-Sidhi Division

Row for 4g Saturation Project-Sidhi Division is a lapsed project in Kurhu, Kusmi, Sidhi, Madhya Pradesh. It seeks 0.8 acres of forest land. Its stated project cost is ₹8 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 7 Oct 2025).

See it on the live map All projects in Sidhi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since7 Oct 2025
Application filed2 Sept 2025
Approval soughtForest land use
Application typeChange of use
SectorOther
ApplicantBasant Kumre
Forest land3,250 m²
Project cost₹8 lakh
Village / localityKurhu
Taluk / tehsilKusmi
DistrictSidhi
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-09861

In context

12 applications in Sidhi since January 2022 are in the same category (Other): 1 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kurhu, Kusmi, Sidhi, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Basant Kumre in Sidhi

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.