Project details
| Status | More information requested |
|---|---|
| Status since | 9 Mar 2024 |
| Application filed | 9 Mar 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Basant Kumre |
| Land area | 800 m² |
| Project cost | ₹60 lakh |
| Village / locality | Majhgama |
| Taluk / tehsil | Kusmi |
| District | Sidhi |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11885 |
In context
6 applications in Sidhi since January 2022 are in the same category (Buildings & townships): 1 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Majhgama, Kusmi, Sidhi, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl Mobile-4g Saturation Project-Fhulwa Village — lapsed, 700 m away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 1.6 km away
- Kotma to Keshlar and Umariya to Badiya Water Pipe Line — lapsed, 6.2 km away
- Sidhi Gulabsagar Water Supply Project — forest land use approved, 8.1 km away
- Sidhi Gulabsagar Water Supply Project — decision issued, 8.1 km away
- Kusmi Water Supply Project — forest land use approved, 8.8 km away
- Kusmi Water Supply Project — lapsed, 8.8 km away
- Kusmi Water Supply Project — decision issued, 8.8 km away
More from Basant Kumre in Sidhi
- Row for 4g Saturation Project-Sidhi Division — lapsed
- 4g Saturation Project for Providing Mobile Coverage — decision issued
- Bsnl Mobile-4g Saturation Project-Fhulwa Village — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.