400 KV D/C Quad Moose Transmission line from MP01 IREP PSP Switch Yard at Rampura, Madhya Pradesh to PGCIL 400/220 KV Neemuch PS at Badi in Neemuch Forest Division Madhya Pradesh is a lapsed power project in Rampura Pathar Reserved Forest, Manasa, Neemuch, Madhya Pradesh. The site covers 2,11,265.9 acres. Its stated project cost is ₹344 crore. As of 27 Nov 2026, its status is “Lapsed” (since 2 May 2023).

See it on the live map All projects in Neemuch

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

400 KV D/C Quad Moose Transmission line from MP01 IREP PSP Switch Yard at Rampura, Madhya Pradesh to PGCIL 400/220 KV Neemuch PS at Badi in Neemuch Forest Division Madhya Pradesh is a lapsed power project in Rampura Pathar Reserved Forest, Manasa, Neemuch, Madhya Pradesh. The site covers 2,11,265.9 acres.

Who is building it?

The applicant is Greenko Mp01 Irep Private Limited.

Has it been approved?

No. The application was lapsed on 2 May 2023, so it is no longer under consideration.

Where is it?

In Rampura Pathar Reserved Forest, Manasa, Neemuch, Madhya Pradesh.

How big is it?

It has a stated cost of ₹344 crore; a site of 2,11,265.9 acres and 415.6 acres (168.2 ha) of forest land.

When was it filed?

The application was filed on 30 Apr 2023.

Project details

StatusLapsed
Status since2 May 2023
Application filed30 Apr 2023
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantGreenko Mp01 Irep Private Limited
Land area2,11,265.9 acres (85,496.4 ha)
Forest land415.6 acres (168.2 ha)
Project cost₹344 crore
Village / localityRampura Pathar Reserved Forest
Taluk / tehsilManasa
DistrictNeemuch
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-09876

In context

15 applications in Neemuch since January 2022 are in the same category (Power): 7 approved, 2 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 2,11,265.9 acres, this one is larger than 86% of them.

Where it is

Rampura Pathar Reserved Forest, Manasa, Neemuch, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Greenko Mp01 Irep Private Limited in Neemuch

All 5 Greenko Mp01 Irep projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.