One of 2 filings for this project. The project's main page, with every filing and where each stands: New 33 KV Line Dargada to Nayanagar
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Nov 2025 |
| Application filed | 16 Aug 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Power |
| Applicant | Rajesh Dhurve |
| Land area | 357.2 acres (144.6 ha) |
| Forest land | 9.2 acres (3.7 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Banjar |
| Taluk / tehsil | Lakhnadon |
| District | Seoni |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11731 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Sept 2025 | Forest land use approved | 357.2 acres | ₹85 lakh |
| Change of use filed 16 Aug 2024 (this page) | Lapsed | 357.2 acres | ₹85 lakh |
In context
15 applications in Seoni since January 2022 are in the same category (Power): 6 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 357.2 acres, this one is larger than 53% of them.
Where it is
Banjar, Lakhnadon, Seoni, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New 33 KV Line Dargada to Nayanagar — forest land use approved, 0 m away
- Badadev Micro Irrigation Project Teriya Dam — under forest review, 15.1 km away
- Sher Complex — cleared for impact study, 22.6 km away
- Jio Digital Fiber Pvt Ltd OFC 5G Project in RoW Corridor of Principal Road… — forest land use approved, 24.7 km away
- Construction, Operation and Maintenance of Sher Irrigation Complex Project,… — more information requested, 25.9 km away
- Lakhandon Narshigpur Main Road to Gram Parasiya to Bhaneari Gravel Road — lapsed, 26.5 km away
- Sher Irrigation Complex Project Dam-2 — lapsed, 26.6 km away
- Environmental Clearance - Sher Irrigation Complex Project (DAM-3) on Sher… — lapsed, 26.9 km away
More from Rajesh Dhurve in Seoni
- New 33KV Adegaon Line Inter. With Jhabua 33KV Line — forest land use approved
- 33KV Lakhnadon to Ganeshganj Interconnection — forest land use approved
- 33KV Chamari to Ghunai — forest land use approved
- 33 KV Ramgarh Keolari to Amarwada — forest land use approved
- 33KV Line Kedarpur S/S to Selwada S/S — forest land use approved
- New 33KV Adegaon Line Inter. With Jhabua 33KV Line — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.