Quick answers
What is New 33/11 KV Gawasen Substation under SSTD scheme?
New 33/11 KV Gawasen Substation under SSTD scheme is a lapsed power project in Panchhi Reserved Forest, Chicholi, Betul, Madhya Pradesh. The site covers 0.6 acres.
Who is building it?
The applicant is Madhya Pradesh Madhya Kshetra Vidut Vitaran Company Limited.
Has it been approved?
No. The application was lapsed on 8 Nov 2025, so it is no longer under consideration.
Where is it?
In Panchhi Reserved Forest, Chicholi, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2.8 crore; a site of 0.6 acres and 2,500 m² of forest land.
When was it filed?
The application was filed on 16 Sept 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 8 Nov 2025 |
| Application filed | 16 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Madhya Pradesh Madhya Kshetra Vidut Vitaran Company Limited |
| Land area | 2,500 m² |
| Forest land | 2,500 m² |
| Project cost | ₹2.8 crore |
| Village / locality | Panchhi Reserved Forest |
| Taluk / tehsil | Chicholi |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10097 |
In context
39 applications in Betul since January 2022 are in the same category (Power): 7 approved, 26 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.6 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Panchhi Reserved Forest, Chicholi, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- BSNL UG OFC Laying under USOF 4G Saturation Project in Range Gawasen Distt-… — lapsed, 350 m away
- USOF 4G Saturation, OFC Laying in Range- Gawasen, Subdivision- Chicholi, DFO -… — lapsed, 350 m away
- BSNL 4G Saturation in Village Bori — lapsed, 2.4 km away
- Bsnl 4g Saturation Project — forest land use approved, 5.1 km away
- Bsnl 4g Saturation Project — lapsed, 5.1 km away
- 4g Saturation Project — lapsed, 7.2 km away
- 4g Saturation Project — lapsed, 9.5 km away
- Bsnl 4g Saturation Project — lapsed, 10.6 km away
More from Madhya Pradesh Madhya Kshetra Vidut Vitaran Company Limited in Betul
- Electrification of Un-Electrified Villages Utari & Palanga and its habitations… — more information requested
- New 11 KV Kukru DLF Feeder, FSP Works under RDSS KfW(FSP) package — under forest review
- New 11 KV Baramacha DLF Feeder, FSP Works under RDSS KfW(FSP) package — under forest review
- New 11 KV Kharwar DLF Feeder, FSP Works under RDSS KfW(FSP) package — more information requested
- New 11 KV Timarni DLF Feeder, FSP Works under RDSS KfW(FSP) package — under forest review
- New 11 KV Chikhlajodi DLF Feeder, FSP Works under RDSS KfW(FSP) package — under forest review
29 Madhya Pradesh Madhya projects in Betul
All 52 Madhya Pradesh Madhya projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.