Quick answers
What is Bsnl 4g Saturation Project?
Bsnl 4g Saturation Project is a lapsed telecom project in Dariyaganj, Chicholi, Betul, Madhya Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Bsnl Betul Mp.
Has it been approved?
No. The application was lapsed on 25 Jan 2024, so it is no longer under consideration.
Where is it?
In Dariyaganj, Chicholi, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹12 lakh; a site of 0 acres and 140 m² of forest land.
When was it filed?
The application was filed on 10 Sept 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Bsnl 4g Saturation Project
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Jan 2024 |
| Application filed | 10 Sept 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bsnl Betul Mp |
| Land area | 200 m² |
| Forest land | 140 m² |
| Project cost | ₹12 lakh |
| Village / locality | Dariyaganj |
| Taluk / tehsil | Chicholi |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09866 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 14 Jan 2024 | Forest land use approved | 0 acres | ₹12 lakh |
| Change of use filed 10 Sept 2023 (this page) | Lapsed | 0 acres | ₹12 lakh |
In context
93 applications in Betul since January 2022 are in the same category (Telecom): 16 approved, 0 filed or under review, and 77 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0 acres, this one is smaller than 91% of them.
Where it is
Dariyaganj, Chicholi, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project — forest land use approved, 0 m away
- New 33/11 KV Gawasen Substation under SSTD scheme — lapsed, 5.1 km away
- BSNL UG OFC Laying under USOF 4G Saturation Project in Range Gawasen Distt-… — lapsed, 5.4 km away
- USOF 4G Saturation, OFC Laying in Range- Gawasen, Subdivision- Chicholi, DFO -… — lapsed, 5.4 km away
- Bsnl 4g Saturation Project — lapsed, 5.6 km away
- 4g Saturation Project — lapsed, 6.9 km away
- BSNL 4G Saturation in Village Bori — lapsed, 7.3 km away
- 4g Saturation Project — lapsed, 7.4 km away
More from Bsnl Betul Mp in Betul
- 4g Saturation Project 500 Days — initial checks
- 4G Saturation 500 days — more information requested
- 4G Saturation 500 days — more information requested
- Bsnl 4g Saturation Project — lapsed
- 4g Saturation Project Under Usof Fund at Villages- Laldhana, Adoumor,… — forest land use approved
- 4g Saturation Project at Villages- Arjungondi, Tokara, Kanari, Rampur, Mudha — forest land use approved
88 Bharat Sanchar Nigam (BSNL) projects in Betul
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.