Quick answers
What is Khategaon Kannod Multi Village Drinking water Supply Scheme?
Khategaon Kannod Multi Village Drinking water Supply Scheme is an approved water and irrigation project in Chandgarh R F, Harsud, East Nimar, Madhya Pradesh. The site covers 0.3 acres.
Who is building it?
The applicant is Madhya Pradesh Jal Nigam Maryadit.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Oct 2024), as of 27 Nov 2026.
Where is it?
In Chandgarh R F, Harsud, East Nimar, Madhya Pradesh.
How big is it?
It has a stated cost of ₹471.5 crore; a site of 0.3 acres and 1,140 m² of forest land.
When was it filed?
The application was filed on 2 Aug 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 2 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Madhya Pradesh Jal Nigam Maryadit |
| Land area | 1,100 m² |
| Forest land | 1,140 m² |
| Project cost | ₹471.5 crore |
| Village / locality | Chandgarh R F |
| Taluk / tehsil | Harsud |
| District | East Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10119 |
In context
17 applications in East Nimar since January 2022 are in the same category (Water & irrigation): 11 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.3 acres, this one is smaller than 94% of them.
Where it is
Chandgarh R F, Harsud, East Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bawadikheda to Pamakhedi Phata Road — more information requested, 13.2 km away
- Proposed Indirasagar-Omkareshwar on-stream Pumped Storage Project (8x80= 640 MW) — under forest review, 15 km away
- Indirasagar-Omkareshwar(640mw)on- Stream Pumped Storage Project — forest land use approved, 15 km away
- Proposed Indirasagar-Omkareshwar on-stream Pumped Storage Project (8x80= 640 MW) — lapsed, 15 km away
- Proposed Indirasagar-Omkareshwar on-stream Pumped Storage Project (8x80= 640 MW) — cleared for impact study, 15 km away
- Indirasagar-Omkareshwar(640mw)on- Stream Pumped Storage Project — forest land use approved, 15.4 km away
- Chikdhaliya to Punasa-Narmadanagar main Road — lapsed, 22 km away
- Chikdhaliya to Punasa-Narmadanagar main Road — lapsed, 22.1 km away
More from Madhya Pradesh Jal Nigam Maryadit in East Nimar
- Indrasgar-1 District Khandwa & Khargone Multi Village Drinking Supply Scheme… — forest land use approved
- Indrasgar-1 District Khandwa & Khargone Multi Village Drinking Supply Scheme… — lapsed
3 Madhya Pradesh Jal Nigam Maryadit projects in East Nimar
All 51 Madhya Pradesh Jal Nigam Maryadit projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.